Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#822575 Posted 5/6/2026

Ground Storage Tank Valve Replacement Project, Cleburne, TX

Owner Reference
26-09
Bid Date
May 21, 2026 at 01:30pm
Pre-Bid
MANDATORY - 5/6/2026 @ 01:30pm @ (for location please or )
Owner
City of Cleburne
Trades
Tank & Silo Construction & Controls, Maintenance, Inspections, Repair & Cleaning, Pressure Washing, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, Machinery and Pumps Contractor; Machinery Repair, Grapple Rebuilds, Motors & Variable Frequency Drives (VFD's), Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, Supervisory Control & Data Acquisition (SCADA): Real-Time Data Utility Automation, Controllers/Timing, Remote Terminal Unit RTUs, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Construction Zone Traffic Control Contractor, Flashing Beacons, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The project generally consists of furnishing all labor, materials, equipment, appurtenances, and incidentals as required for the replacement and/or modification of the ground storage tank fill valves at Cleburne Pump Stations #12 & #14. The major work in this project shall generally consist of but is not limited to the construction of a new concrete valve vault and piping at PS #12, using the existing valve vault for the new bypass piping, modification to the existing fill valve and piping at PS #14, electrical, controls, SCADA and coordination, and site improvements. The project includes approximately 70 LF of 12 to 20 PVC and DIP by open trench installation method. The project will encompass surface restoration, site protection and grading, traffic control and all miscellaneous and incidental work required to complete the project.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 822575 | Published 5/6/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208