#821196
2026 IDIQ Chilled Water Construction in the ROW, Austin, TX
Facilitate the expansion and maintenance of Austin Energys district energy chilled water system by connecting new customers through the installation of chilled water piping and related infrastructure within the City of Austin Right of Way. This includes excavation, tunneling, dewatering, traffic control, and integration with existing systems. The contract ensures reliable service delivery, infrastructure resilience, and alignment with Austin Energys long-term operational goals.
Post Date: 04/28/2026
Bid Date:
06/03/2026
Trades: Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, Construction Zone Traffic Control Contractor, Flashing Beacons, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors