Phase 3 Construction for Solid Waste, Dry Fork, VA
- Owner Reference
- 2253619.01
- Bid Date
- May 22, 2026 at 02:00pm
- Questions Due By
- 5:00 p.m. on Tuesday, May 12, 2026
- Pre-Bid
- MANDATORY - 4/28/2026 @ 01:00pm @ (for location please or )
- Owner
- County of Pittsylvania
- Trades
- Landfill Flare Management / Leachate System Improvements: Utility BioGas, Candlestick Flame, Excess Combustion, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Sand Bags, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 260 days
Description
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 820093 | Published 4/21/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208