Construction of Pump Station #113 Force Main Replacement, VA Beach, VA
- Owner Reference
- PUCN-26-0005
- Bid Date
- May 20, 2026 at 03:00pm
- Questions Due By
- 5/8/2026 5:00 PM
- Pre-Bid
- Scheduled, Optional - 4/30/2026 @ 10:00am @ (for location please or )
- Owner
- City of Virginia Beach
- DBE Goal
- 12%
- Trades
- Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF), *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 270 consecutive calendar days
Description
This work includes the replacement of approximately 1,600 linear feet of existing 10-inch cast iron force main with a new 10-inch ductile iron (DIP) force main. The proposed alignment extends from City Pump Station 113, located on Morgans Lane, to a new connection with the existing 16-inch DIP force main along Birdneck Road.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 821189 | Published 4/28/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208