Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#821669 Posted 4/29/2026

Malaga Water System Improvements Phase 2 Saturday Avenue and Dixie Lane Transmission Water Main, Douglas Co, WA

Bid Date
May 20, 2026 at 09:00am
Owner
Chelan Douglas Regional Port Authority (CDRPA)
Trades
Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Construction of approximately 9,000 linear feet of a transmission water main, pressure reducing valve and vault, combination air valve vaults, isolation valves, surface restoration and related work.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 821669 | Published 4/29/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208