Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#826746 Posted 6/1/2026

Grant Rd and Nile Ave Intersection Improvement, East Wenatchee, WA

Owner Reference
TLS 26-28A, Fed Aid HSIP-5908(012)
Bid Date
Jun 22, 2026 at 10:00am
Estimate
$3.0M - $3.75M
Owner
County of Douglas, WA
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Work consists of removal of structures and obstructions, roadway excavation, embankment compaction, catch basins, storm sewer, crushed surfacing, pigmented concrete pavement, hot mix asphalt, erosion control, roundabout cement concrete curb and gutter, roundabout central island cement concrete curb, roundabout truck apron cement concrete curb and gutter, traffic curb and gutter, permanent signing, illumination system, pavement marking, temporary traffic control, sidewalk, concrete driveway, curb ramp, mailbox supports, and other work.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 826746 | Published 6/1/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208