Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#826487 Posted 5/29/2026

LV-Campus Loading Dock Repairs - Department of Social and Health Services, Medical Lake, WA

Owner Reference
2026-402 G (1-1)
Bid Date
Jun 25, 2026 at 01:00pm
Questions Due By
Jun 15 at 1pm
Pre-Bid
MANDATORY - 6/4/2026 @ 10:00am @ (for location please or )
Estimate
$490,000 - $540,000
Owner
State of Washington Department of Enterprise Services (WADES), WA
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

In general, the scope includes: Food Services Loading Dock: Remove and replace the existing loading dock leveler with new mechanical pit style dock leveler, replace bumpers along the face of the dock, and replace the safety railing, hand railing on loading concrete stairs, and replace handrailing adjacent to the loading docks. Additionally this work involves removing and replacing a portion cracked/failing concrete slab on the loading dock, remove existing CMU bulkhead wall and replacing with cast in place concrete wall, remove existing concrete apron approach to the loading dock, remove and replace existing trench drain near the approach of the loading docks, repair existing damaged concrete dividing wall between the two loading docks, bend existing railing fixed on top of the dividing wall and repaint to match existing railing, apply chemical resistant coating over the loading dock concrete slab used by staff, remove and dispose of Lead Based paint identified on the existing dock levelers in accordance with all local/state/federal requirements. Laundry Services Loading Dock: Remove and replace two (2) existing loading dock levelers with new in-kind dock levelers, replace dock leveler bumpers, remove and replace a portion of cracked/failing concrete slab on the loading dock, remove and replace a portion of the concrete bulkhead wall, repair damaged concrete column, remove and replace existing asphalt/concrete approach that is failing and replace with new concrete slab, repaint the face of the bulkhead wall, apply chemical resistant coating over the loading dock concrete slab used by staff. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 826487 | Published 5/29/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208