#825533

Oakville ADA Retrofit, Oakville, WA

This Contract provides for the construction of ADA-compliant ramps and driveway approaches along Main Street from the intersection of Park Street to the intersection of State Street. Work includes, but is not limited to, removal and replacement of existing concrete ramps, removal and replacement of concrete driveway approaches, installation of a Rectangular Rapid Flashing Beacon (RRFB) system, cleaning of existing drainage structures, temporary traffic control, erosion and water pollution control.

Post Date: 05/22/2026 Bid Date: 06/11/2026 Trades: Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
#826779

RFP HVAC System Replacement, Aberdeen, WA

Quinault Community Health (QCH) is seeking qualified contractors to submit a Request for Proposal (RFP) for the replacement and installation of a new HVAC system at our healthcare clinic located at 1020 Anderson Drive, Aberdeen, WA - Building 200. The goal of this project is to design and implement a reliable, high-performance HVAC system that ensures consistent indoor air quality, optimal temperature control, and long-term operational dependability. The system must be energy-efficient and aligned with applicable sustainability standards, while meeting or exceeding all local, state, federal, and tribal regulatory requirements.

Post Date: 06/01/2026 Bid Date: 06/18/2026 Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
#822192

RFP New Wastewater Treatment Plant Design, Queets, WA

The Quinault Indian Nation seeks proposals from qualified design teams to provide acrchitecture and engineering design services for a new wastewater treatment plant replacing the existing facilities in Queets, WA, to include complete site development plans, civil planning of undeveloped lands, full architectural and engineering, and complete engineer's estimates and construction documents. Work on the Project is estimated to begin in 2026 and to be completed by 2027. TERO applies.

Post Date: 05/04/2026 Bid Date: 07/03/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#803262

Architectural, Engineering & Surveyors Roster / Small Works Roster, Ocean Shores, WA

City of Ocean Shores is generally announcing its projected requirements for certain architectural, engineering and surveying services for the 2026 calendar year. For any particular project, the consultants to be considered will be selected from the Architectural, Engineering & Surveying Roster of consultants or from responses to advertisements for consultants for the project. All applications will be kept on file for one year and tossed. Interested firms should submit two (2) copies of their general statement of qualifications that includes the following information:
    Professional Service Roster Application General Statement of Qualifications that includes the following information:
- Cover Letter. - The disciplines or fields of expertise. - A list of current and completed projects (within the past five years). - A brief history of the firm/individual and resumes of principals.
Post Date: 01/10/2026 Bid Date: 12/31/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#806851

2026 Small Works Roster, Ocean Shores, WA

City Council, the City of Ocean Shores is accepting applications for its Small Works Roster. The roster will cover projects estimated to cost $350,000 or less. If you wish to be included on the Citys Small Works Roster, a current application must be on file.

Post Date: 01/31/2026 Bid Date: 12/31/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, All Other Specialty Trades (except foundation, structure, building exteriors, equipment, site prep, Other Specialty Trade: Installing/Servicing/Rebuild of Building Equipment (Excludes Electrical, Plumbing, HVAC equipment)
#817968

US 12, Heron St Bridge Grid Deck Replacement, Grays Harbor Co, WA

Requires replacing steel grid deck panels and sidewalk curb for Bridge No. 12/12S, temporary traffic control, and other work. Involves 29 items and 86 working days. Work Class 6, bridges and structures. A state funded contract with a 5% condition of award public works small business enterprise goal and a 2% condition of award veteran owned business goal.

Post Date: 04/07/2026 Bid Date: 05/06/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#819113

Mox Chehalis Creek RM 5.3-6.3 BDA Construction 2026, McCleary, WA

Grays Harbor Conservation District is implementing a low-tech creek restoration project on Mox Chehalis Creek from river mile (rm) 5.3-6.3. This contract involves the construction of 37 hand-built, post-supported wood structures called beaver dam analogs.

Post Date: 04/14/2026 Bid Date: 05/06/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#819410

Aberdeen School District Capital Projects 2026, Aberdeen, WA

Minor capital projects of the existing Aberdeen Weatherwax High School. Scope of work includes a new steel canopy, wood shop dust collection system, guardrail upgrades, culinary ADA counter/sink, and all associated MEP/Fire Safety requirements as prescribed by code. The Scope of Work for this Project consists of three areas of modifications to the existing High School. Modifications include: Modify existing half wall railings identified on drawings to attach safety glass panels. Install dust collection system for shop room as identified in drawings. a. b. Install steel framing and low slope roof canopy as noted in drawings. Install exterior concrete equipment pads for dust collection equipment. Install kitchen equipment per drawings.

Post Date: 04/15/2026 Bid Date: 05/06/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#820812

Westport Skatepark, Westport. WA

The work consists of furnishing all material, labor, tools, equipment, and incidentals necessary for construction of the Westport Skatepark project. The work consists of, but is not limited to, the following: (1) site clearing, earth moving, erosion and sediment control; (2) skatepark construction, including concrete flatwork, concrete reinforcement, cast in-place concrete, shotcrete, metal fabrications, painting, drainage, and associated appurtenances; and (3) surface restoration of all disturbed surfaces.

Post Date: 04/24/2026 Bid Date: 05/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#814224

RFP Quinault Indian Nation Longhouse-style Cultural Center, Taholah, WA

TERO applies. The Quinault Indian Nation seeks proposals from qualified design teams to provide architecture and engineering design services for a longhouse-inspired cultural center (roughly 12,000 square feet) in Taholah, WA, to include complete site development plans, civil planning of undeveloped lands, full architectural and engineering, and complete engineer's estimates and construction documents. All work must be completed by June of 2027. The current community center, used for many cultural events, is located in the lower village area of Taholah, and is susceptible to flooding from the Quinault River and Pacific Ocean. A new longhouse-inspired cultural center is part of QINs larger effort to relocate the community to higher ground, outside the flooding and tsunami-inundation zone.

Post Date: 03/16/2026 Bid Date: 05/22/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#821944

Forest Road Construction Contract, Grays Habor Co, WA

Construct approximately 27+00 stations of new forest logging roads and associated landings. Further information concerning this project, necessary forms for submitting a bid, maps and contract specifications are available at the office of the Grays Harbor County Forestry Dept., 310 W. Spruce Ave., Suite 100, Montesano, WA 98563, (360) 249-5071. All prospective bidders are encouraged to obtain this information and inspect the project areas on the ground prior to submitting a bid.

Post Date: 05/02/2026 Bid Date: 05/26/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#820808

RFQ Lake Swan Dam Study - Grays Harbor College, Aberdeen, WA

This Request for Qualifications is for the purpose of selecting a Consultant for Scope/Budget alignment of recommended course of action for the Lake Swano Dam Study located at Aberdeen, WA. This scope of work includes final design services. A final design and bid package would be the expected outcome of this study by the awarded firm.

Post Date: 04/24/2026 Bid Date: 05/28/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#824652

Terminal Maintenance Dredging 2026-2027, Grays Harbor, WA

The proposal consists of removing sediment from a specified dredge prism as outlined in the plans and specifications for two rounds of the maintenance dredging at the Ports 4 Marine Terminals. Contractor will be required to provide water quality monitoring during operations and will be required to conform to all environmental permits issued for the project.

Post Date: 05/18/2026 Bid Date: 06/03/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors