Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all San Juan County, WA

#824272

Floating Pumpout Station Pile Installation at Sucia Island State Park, San Juan Co, WA

This project includes providing all materials, labor, and equipment necessary to procure and install two galvanized steel piles for the Sucia Island Marine State Park Pumpout Station and the Installation of the Owner-furnished floating pumpout barge. This project also includes the following: Marine Mammal and Marbled Murrelet Monitoring Construction Surveying Protected Species Monitoring Suspension

Post Date: 05/15/2026 Bid Date: 06/16/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#824316

Sucia Island Marine State Park - Floating Pumpout Station Pile Installation, San Juan County, WA

This project includes the following actions: 1. Provide all materials, labor, and equipment necessary to procure and install two galvanized steel piles for the Sucia Island Marine State Park Pumpout Station. 2. Installation of the Owner-furnished floating pumpout barge.
Post Date: 05/16/2026 Bid Date: 06/16/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#821875

San Juan County Historic Courthouse Rehabilitation, Friday Harbor, WA

The Work consists of: 1. Voluntary seismic strengthening of the Courthouse including installation of cold-formed steel shear walls, concrete foundations and rock anchors, steel collectors and floor-to-wall ties, carbon fiber reinforced polymer (FRP) wrap of the concrete columns, FRP strengthening of the concrete slabs, supplemental gravity system steel columns, new anchors at the existing parapet braces, and strengthening canopies over the covered porches. 2. Associated Work includes removal and replacement of finishes as needed to accommodate structural elements, including installation of new finishes to match adjacent historic finishes, reinstallation of historic wood trim, targeted roofing repairs, targeted brick repair and repointing, relocation of mechanical, electrical, and plumbing, and storing and protecting furniture and contents of the courthouse offices throughout the Work. 3. Roofing assembly replacement at the east and south entrance canopies to accommodate seismic retrofit. The following alternate Work activities will be performed at discretion of Owner: 1. Repointing of the entire exterior facades of the historic Courthouse. 2. Removal and replacement of window exterior perimeter sealant. 3. Moving furniture, storage, files and personal items from the Courthouse to a temporary office space. 4. Building and installing new casework in the courtroom.
Post Date: 05/01/2026 Bid Date: 06/17/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#827390

RFP Level 2 EV Charging Station Installation Viilage at the Harbor, Friday Harbor, WA

Major items of work include, without limitation, all labor, materials, and equipment necessary for the completion of the [installation of eight (8) Level 2 EV charging ports at Village at the Harbor Assisted Living, 543 Spring Street, Friday Harbor, WA 98250, including all associated electrical work, equipment, conduit, signage, and site improvements in accordance with EVCP grant requirements].

Post Date: 06/03/2026 Bid Date: 07/02/2026 Trades: Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV)
#826454

M.V. Kaleetan Drydocking Contract, Puget Sound , WA

The Contract work consists of the following repairs to the Super Class ferry M.V. Kaleetan: USCG U/W hull and internal inspections, anode inspection, gauge vessel steel, anode renewals, 100% topside washdown, prepare and paint topside, elevator preservation, vehicle deck steel renewal, curbing repairs and shaft seal replacement. The vessel has a length: 382'-2", beam: 73'-2", draft: 18'-6", displacement: 3634 LT, and carries 144 vehicles and 1,800 passengers. All of the work must be performed within Puget Sound, Washington during the period of September 30, 2026 November 13, 2026. This is a state funded project with Condition of Award goals in the amount of five percent (5%) Public Works Small Business Enterprise (PWSBE) and two percent (2%) Veteran Owned Business (VOB) of the Contract bid amount.

Post Date: 05/28/2026 Bid Date: 07/09/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors