Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#819631 Posted 4/17/2026

Childcare Center Playground Drainage and Safety Upgrades, Olympia, WA

Owner Reference
F26-410
Bid Date
May 13, 2026 at 02:00pm
Pre-Bid
Scheduled, Optional - 4/21/2026 @ 09:00am @ (for location please or )
Estimate
$145,200 - $177,400
Owner
Evergreen State College
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The College proposes to improve the drainage at the Childrens Center. Related work includes excavation and removal of asphalt, concrete, a strip drain, a drain line, and a catch basin. Work also includes installing synthetic turf, a concrete retaining wall, and drainage elements.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.

Plans & Specifications

or to view plans and specification details.

CBS ID: 819631 | Published 4/17/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208