SR 510, Yelm Loop New Alignment Phase 2, Thurston Co, WA
- Owner Reference
- XE3742
- Bid Date
- Jun 24, 2026 at 11:00am
- Estimate
- $50.0M - $60.0M
- Owner
- State of Washington Department of Transportation (WSDOT), WA
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Requires: grading, asphalt paving, concrete paving, roundabout construction, stormwater facilities, structures over Yelm Creek and the Yelm Prairie Line Trail, retaining walls, noise wall, utility relocations, signing, rapid-rectangular flashing beacon signals, illumination, closed-circuit television cameras, intelligent transportation systems (ITS) conduit and fiber, roadside restoration, traffic control and other work. Involves 295 items and 705 working days. Work class 1, clearing, grubbing, grading and drainage. Tier 3 project. A state funded contract with a 5% condition of award public works small business enterprise goal and a 3% condition of award veteran owned business goal.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 823747 | Published 5/12/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208