Newhall Park Water Quality Project, Concord, CA
Description. The Project is located at Newhall Community Park, City of Concord, California. The work consists of mobilization; traffic control; public convenience; installation of construction fencing; storm water pollution and erosion control; clearing and grubbing, tree trimming, tree and root protection; protection of existing improvements; removal and installation of existing signs; removal of benches; dredging of approximately 4,500 cubic yards of material from the upper pond and 5,500 cubic yards of material from the lower pond including filtering, drying and spreading of dredged material; landscape improvements with new temporary irrigation; miscellaneous storm drain improvements; and all other work shown on the Plans and as specified in the Project Manual.