Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all Grand County, CO

#817877

NEW BID DATE*PRE-BID RESCHEDULED: Wastewater Lagoon Liner Replacement, Hot Sulphur Springs CO

Wastewater lagoon liner 1 replacement. Relocate aerators from lagoon 1 to lagoon 2. Dewater Sludge, remove sludge, remove curtains, remove liner, remove contaminated soil, replace removed soil and compact to grade, install degas system, install new liner, install new curtain, relocate aerators back into lagoon 1.

Post Date: 04/07/2026 Bid Date: 06/19/2026 Trades: Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station, CO-21 - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#821146

NEW BID DATE: 2026 Asphalt Rehabilitation Project, Winter Park CO

Asphalt Repairs as outlined in Kimley/Horn Construction Documents and Bid Forms for Winter Park Drive, Lakota Trail, Rendezvous Way, and Vasquez Drive.

Post Date: 04/28/2026 Bid Date: 06/02/2026 Trades: CO-12 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, CO-05 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#824002

NEW BID DATE*PRE-BID SCHEDULED: Grand Lake Stormwater Plan, Grand Lake CO

The Town of Grand Lake, Colorado (the "Town" or "Owner") is soliciting sealed competitive bids from qualified, experienced general contractors for construction of the Grand Lake Stormwater Plan (Project No. 2026001054). The Project consists of constructing approximately 368 linear feet of riprap drainage swale, two bioretention water-quality facilities (B-1 and B-3), associated ditch and outfall improvements, reinforced concrete pipe (RCP) culverts, a precast grated catch basin, void-filled riprap armoring, erosion control, riparian and upland seeding, and bioretention plantings within the Town of Grand Lake, Grand County, Colorado.

Post Date: 05/13/2026 Bid Date: 06/12/2026 Trades: Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales, CO-01 - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors