Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#824015 Posted 5/13/2026

Charles Barnum Elementary School Roof Replacement, Groton, CT

Owner Reference
State Project No. 059-0192 RR
Bid Date
Jun 10, 2026 at 02:00pm
Pre-Bid
Urged - 5/20/2026 @ 04:00pm @ (for location please or )
Owner
Groton Public Schools, CT
DBE Goal
SBE: 25%; M/W/DO Businesses: 6.25% of State Portion
Trades
Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The Work of the Project is defined by the Contract Documents and consists of a partial roof replacement of an existing building. The Work generally includes, but is not necessarily limited to the following major elements: 1. Removal of existing membrane roofing, insulation, cant strips and tapered edges, and metal flashings. 2. Removal and replacement of existing masonry veneer where necessary to accommodate flashing. 3. Removal and replacement of existing metal guardrail and ladders, roof hatch, and other roof accessories. 4. Removal and replacement of deteriorated roof decking and wood blocking. 5. Removal and replacement of existing unit skylights. 6. Removal and replacement of existing roof drains and related piping and insulation. 7. Provision and installation of TPO membrane, underlayment, and flat and tapered insulations. 8. Provision and installation of new flashings, caps, fasciae, and other trim metal work as detailed and specified, including new collection boxes, downspouts, and scuppers. 9. Offsite disposal of all removed materials.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 824015 | Published 5/13/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208