Downes Construction Company, LLC acting as Construction Manager on behalf of The Town of Plainville solicits bids for the individual bid packages listed in the attached for the Middle School of Plainville Renovations - Construction Phase. Bid Packages are as follows: Final Cleaning (SMWBE); Selective Demolition; Concrete; Masonry; Structural Steel / Misc Metals; Architectural Woodwork & Casework; Roofing & Sheetmetal; Doors, Frames & Hardware (FO) (SMWBE); Aluminum Entrances & Storefronts, Windows & Metal Panels; Gypsum Drywall; Acoustical Ceilings; Tile & Flooring; Painting & Resinous Floors (SMWBE); Specialties & Equipment (SMWBE); Food Service Equipment; Elevator; Fire Suppression; Plumbing; HVAC; Electrical, Security & A/V; Communications (SMWBE); Fire Alarm (SMWBE); Sitework & Landscaping.
Post Date: 05/11/2026Bid Date:06/11/2026Trades: Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Masonry Contractor, Precast Concrete; Mortar Repair, Tuckpointing, Brick Pointing, Finishing Joints, Stone Masonry Contractor: Block Wall, Chimneys, Retaining Walls, Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards, Door Service Contractor: Including Bay Doors, Fire Doors, Gates, Activating Devices & Overhead/Garage Door Opener, Structural Steel & Steel Erection Contractor, Painting Contractor: Exterior/Interior Finish, Decorating; Interior Wallpaper & Wall Coverings, Wood Flooring Contractor, Elevator Contractor: Installation, Inspections, Maintenance, and Repairs: Vertical Lifts & Dumbwaiters, *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching, Site Preparation, Sitework, Prep Work & Prepwork, HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's, Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , Security System: FOB, Access Control, CCTV, Video Surveillance, Active Threat, Intrusion Alarms (Except Locksmiths) NAICS 561621, Fire Protection: Fire Alarm, Smoke Detection & Fire Suppression Contractor, Fire Extinguishers, Pumps, Hydrants & Inspections
The City of Hartford (the City) seeks responses from a qualified contractor to provide drainage, roadway and related improvements in the Northwood Cemetery in Windsor, Connecticut.
Post Date: 05/22/2026Bid Date:06/11/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The annual maintenance procedure shall consist of the following: 1. Remove oil drawer assembly. Clean and check oil nozzle. If equipped with spark ignition; clean, inspect and gap electrodes. 2. Clean and inspect diffuser. 3. Clean oil strainer. 4. Remove ignition assembly. Clean, replace ignition electrode and set proper spacing. 5. Check combustion air fan for cleanliness. 6. Check vent line on gas regulators and switches for blockage. 7. Perform gas valve leak test on both main and auxiliary gas valves. 8. Check all burner linkages; lubricate and tighten. 9. Check flame scanner and scanner mounting pipe for cleanliness. 10. Properly check and tighten all electrical connections and make sure Flame Safeguard is firmly connected to base. 11. Run burner through complete operation sequence on all available fuels and check for proper operation of all interlocks, operating and limit controls. Check scanner for spark pick-up. 12. Adjust gas pilot for proper signal and perform gas pilot flood test. 13. Conduct complete combustion analysis test on burner. Adjust for efficient operation on all fuels and high and low firing rates. Check for CO on gas operation. Fill out complete Power Flame start-up sheet or provide read-out from electrical combustion analyzer. 14. Wipe burner down and check for any oil leaks and correct. 15. Use a combustion analyzer to ensure proper burner adjustment. Submit the original printout report from the analyzer with each burner service keep copy for your records 16. Follow manufacturers I.O.M.S. for proper burner adjustments of O2, CO, CO2 & Flue Temp. make adjustments as needed. 17. Assure proper operation of burner firing controls submit supporting documentation. All lo-hi-lo and full modulating burners shall have proper DDC control including reset of lo-hi-lo or modulating firing rates any improper firing control issues must be documented in a report any burner that shows signs of high cycle rates must be documented consult manufacturer of boiler for proper corrections needed and submit cost of repairs for approval prior to proceeding.
Post Date: 05/29/2026Bid Date:06/11/2026Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's, Building Maintenance, Installation & Repair Services: General Appliance Repair, Make Ready, Minor Renovations & Repairs
Branford Public Schools wishes to solicit proposals for On-Call General Trades Services, including emergency 60-minute response times to District locations. The successful Respondent will be able to provide repair, maintenance, renovation, and minor construction services for facilities owned and operated by Branford Public Schools. Services should be performed on an as-needed basis at various locations. The Town of Branford has six (6) schools within their district. In general, services anticipated include: General rough and finish carpentry Drywall installation and/or repair Installation and/or repair various items including but not limited to, wall framing, blocking/supports, cabinets/casework, countertops, shelving, markerboards/tack boards, toilet partitions Construction of small partitions or enclosures Construction of temporary barricades or protective partitions Miscellaneous projects/alterations
Post Date: 06/01/2026Bid Date:06/11/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Connecticut Center for Advanced Technology (CCAT) (Owner) is seeking proposals from qualified Design-Build firms to provide complete design and construction services for the new approximately 56,000 sf manufacturing technology innovation and readiness center in East Hartford, CT. The Design-Builder shall provide all labor, materials, equipment, design services, and construction services necessary to complete the project, in general, including but not limited to: 1. Pre-Construction Services; 2. Construction Services; 3. C. Close-out Services. MBE/WBE/DBE participation requirements
Post Date: 05/13/2026Bid Date:06/12/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The Bungay Elementary School Building Committee (the BESBC) and the Town of Seymour, Connecticut (Town) are requesting sealed qualifications and sealed proposals from qualified firms to provide comprehensive project management and owners representative services to the Seymour Public School District (the District) and Town, in connection with the planning, design, construction, and closeout of a project for the construction of the new Bungay Elementary School building and grounds and the potential demolition of the existing Bungay Elementary School Building (the Existing Building) (the Project) located at 35 Bungay Road, Seymour, Connecticut 06483 (the Property), and in connection with an anticipated school building project grant from the State of Connecticut for the Project. This solicitation is both a request for qualifications and a request for proposals (RFQ/RFP). Proposers must respond to both the RFQ and the RFP separately. Responses must be submitted in separate sealed envelopes.
Post Date: 05/18/2026Bid Date:06/12/2026Trades: Professional Project Management Consulting Services (PM/PMCS) & Owner's Representatives
The City of Meriden-Water Department is seeking various laboratory testing services as well as providing any technical assistance, evaluation of data and other related service, as required.
Post Date: 05/29/2026Bid Date:06/12/2026Trades: Water Conditioning Equipment Contractor: Water Quality, PFAS Detection, Monitoring, Testing & Mitigation
The City of Norwich is soliciting bids for the General Rehabilitation of 25 Platt Avenue, Norwich, CT as more fully described in the attached.
Post Date: 06/01/2026Bid Date:06/12/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The Town of Manchester is soliciting bids from qualified and licensed contractors to Fabricate and Install 11 Welcome to Manchester Signs as detailed in the Gateway Sign Package Bid Construction Details. The contractor shall also be responsible to dismantle, remove and dispose of all existing signs and hardware. This bid may be subject to Prevailing Wage.
Post Date: 06/02/2026Bid Date:06/15/2026Trades: Signs & Signage Contractor: (Non-Electrical & Electrical) Digital & Video Displays, Tower Clocks, Billboards, Scoreboards, Wayfi
The City of Norwalk is resoliciting bids for IT Room Upgrades at Norwalk City Hall. The requirements of this project are outlined in greater detail under Section 2 Scope of Work/Project Specifications. Furnish and install new ramp, partitions, doors and finishes. Electronic Submission: 2:00 PM on June 16th. Hard Copy Submission: 2:00 PM on June 18th.
Post Date: 05/22/2026Bid Date:06/16/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The City of Waterbury, Department of Engineering, solicits proposals from qualified third parties for Berkley Heights Park Basketball Court Improvements as more fully detailed in the attached. The scope of work for this Project involves reclaiming or removal and proper disposal of the existing basketball court surface and the existing posts and backboards including their concrete foundations. The court shall then be expanded as shown on the plans by excavating and installing new base material. The disturbed subbase will then be graded, compacted and prepared for construction of the new court. New posts, backboards and hoops shall be installed, aligned and fastened in position with new concrete foundations. Forms shall be placed and secured, post-tensioning cables shall be installed, and concrete shall be placed, finished and cured. After the forms have been stripped and the concrete properly cured the post tensioning cables shall be stressed as specified. The court surface shall then be painted with the required coverings. New team benches shall be installed, and all disturbed areas shall be restored to a suitable condition.
Post Date: 05/31/2026Bid Date:06/16/2026Trades: Interior/Exterior Sports Athletic Facilities: Sports Courts, Paving, Concrete or Wood Flooring: Basketball, Racquetball, Tennis, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The State of Connecticut, Department of Transportation solicits bids consisting of MSR retrofit in the Towns/Cities of Bristol, Killingly, Manchester & Newington in Hartford & Windham Counties, CT. District Number(s): 1- Rocky Hill. Prequalification Work Classification(s): 7- Road Construction and Rehabilitation: Limited Access Highways/Freeways. State Funding.
Post Date: 05/21/2026Bid Date:06/17/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The project will consist of replacing the existing 36 storm pipe from Green Road to its terminus point approximately 310 ft to the south in the City of Meriden. Refer to project plans titled Plan and Profile of a Drainage Line at 115 Green Road, Meriden CT 06450, dated May 14, 2026, included with this bid package for approximate limits of work. Work will include, but not limited to, removal of existing corrugated metal storm pipe and replace it with a new HDPE storm pipe. Although the pipe is on private properties, it is located within an existing City easement.
Post Date: 05/29/2026Bid Date:06/17/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
Waterbury Public Schools (WPS) is soliciting proposals from qualified aquatic systems contractors todesign, furnish, and replace two (2) leaking steel surge tanksserving the Olympic-size pool at John F. Kennedy High School. The existing surge tanks are deteriorated, leaking, and no longer suitable for reliable pool operation or long-term maintenance.
Post Date: 05/31/2026Bid Date:06/17/2026Trades: General Swimming Pool Contractor: Cleaning, Plaster & Resurface, Tiles, Depth Markers, Equipment & Repairs, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The City of Waterbury solicits proposals from fully licensed and insured General Contractors and/or Home Improvement Contractorsto provide complete services for renovation and revitalization of single-family, single-unit residential projects. The City is offering Community Development Block Grant (CDBG) funds for Single Family, single unit Home Repairs deemed as emergency due to urgent repairs and having to do with the health, safety and livability of the assisted home and its occupants. The scope of each individual project is unique and based on individual needs. The intent is to contract with more than one company to create an on-call list for emergency repairs. It is not necessary for all contractors to provide all services. Proposals will be accepted from specific trades: i.e. plumbing, HVAC, roofing, etc. Proposers need not be an all-in-one contractor.
Post Date: 05/31/2026Bid Date:06/17/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The City of Stamford solicits bids to establish a contract for the provision of Emergency and Non-Emergency HVAC maintenance and repair services on an as-needed basis at all City of Stamford facilities. The scope of work is further delineated in the specifications provided for this project.
Post Date: 05/21/2026Bid Date:06/18/2026Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
Various Town owned manhole cover and frames are required to be raised. Additionally, the Town of Trumbull repaves various roadways as part of The Town Wide Paving Program. The amount of manholes to raise is unknown at this time. A minimum of 8 adjustments per mobilization shall be assumed. New manhole frames and covers are to be supplied by the Town if replacement is deemed necessary.
Post Date: 05/29/2026Bid Date:06/18/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
SCOPE Pressure Test suction, return, & main drain lines. Report & verify results with Parks Department staff. Cut out/remove existing filter system & piping. Furnish & install new main drain sumps into the pool structure connected to new 10 sch 40 PVC main drain piping. Main drains & piping to be hydraulically balanced with 10 tees & required piping manifolds. Line velocity to be no more than 4/second. Furnish & install new 8 sch PVC wall inlets/returns piping to pool structure. Line velocity to not exceed 6/second. Furnish & install new pump & strainer with requirements of 680 gpm. Furnish & install new high pressure sand horizontal filters to be meet the 680 gpm requirement. Filter face piping to be manual linkage with complete flow control. Face piping to be sch 40. Filters can be either stainless steel or fiberglass. All valves to be Bray with flanges & stainless steel stems. Connect new perimeter piping to existing perimeter piping with proper valves & isolation. New system to have the capability to isolate between existing piping & new piping. Reconnect sanitation system to both new & existing piping. Label piping. Repair/replace any deck or pool structural removals necessary to complete installation. Obtain State of CT DPH permit for new code compliant structural fittings and filter system. Instruct Parks Department staff on system operation after installation.
Post Date: 05/29/2026Bid Date:06/18/2026Trades: General Swimming Pool Contractor: Plaster & Resurface, Tiles, Depth Markers, Equipment, Solar Heat Systems & Repairs, General Swimming Pool Contractor: Cleaning, Plaster & Resurface, Tiles, Depth Markers, Equipment & Repairs