Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#827763 Posted 6/6/2026

W. Wright Street Sidewalk Improvements, Pensacola, FL

Owner Reference
26-041
Bid Date
Jul 7, 2026 at 02:30pm
Questions Due By
June 25, 2026 10:00 A.M.
Pre-Bid
Recommended - 6/18/2026 @ 09:00am @ (for location please or )
Owner
City of Pensacola, FL
Trades
CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
45 calendar-day

Description

The purpose of this project shall be to improve pedestrian connectivity along the West Wright Street corridor, from A to G Street. This project enables individuals in the neighborhood to safely access A Street to the east, and W Belmont and W Gregory Streets to the north and south of Wright Street. This project includes but is not necessarily limited to demolition of pavement, excavation, cut/fill, concrete paving, construction of curb/gutter, installation of formwork, placement of asphalt, adjustment of water meter boxes, valve boxes, cleanouts, and other utility enclosures, placement of thermoplastic pavement markings, adjustment or relocation of existing landscaping, and sodding. All sidewalks shall meet accessibility requirements as much as practicable including grading and finishing to achieve required cross and running slopes, placement of detectable warning plates, and construction of ramps that do not cause ponding of or impede the flow of stormwater. In addition to the aforementioned scope, the placement of 2 parallel segments of 2 PVC electric conduit and electric pull boxes behind the newly constructed sidewalk shall be included as an additive alternative. Parallel segments of conduit crossing B, C, D, E, F, and G Streets shall be directional bored in at 60 depth to minimize road disturbance and prevent road closures. There is no electric work included in this project, only the placement of infrastructure to support future improvements.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 827763 | Published 6/6/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208