Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#823525 Posted 5/11/2026

Sheriff's Substation Roof Replacement, Avon Park, FL

Owner Reference
26-06
Bid Date
Jun 2, 2026 at 02:00pm
Owner
City of Avon Park, FL
Trades
CGC - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, CC - Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
120 days

Description

The Contractor shall furnish all labor, materials, equipment, supervision, permits, and incidentals necessary to complete the Sheriffs Substation Roof Replacement. The Contractor shall be responsible for providing a complete, code compliant, and fully functional roofing system. All work necessary to complete the project shall be included, whether specifically stated or reasonably implied. Contractor shall verify all existing conditions, measurements, and quantities prior to submission.

1. GENERAL REQUIREMENTS Contractor shall comply with all applicable Florida Building Code requirements and manufacturer specifications Contractor shall provide full-time, competent supervision on site at all times Contractor shall maintain compliance with OSHA safety standards Contractor shall provide all required safety measures including signage, barriers, and fall protection Contractor shall provide sanitary facilities for workers Work may be performed Monday-Saturday from 7:00 A.M. until 6:00 P.M. Overtime rates will not be paid and shall not be submitted as part of the bid Roof and wall attachments/appurtenances (A/C, fire sprinkler, antenna, conduits, etc.) shall be removed and reinstalled by the Contractor, or a subcontractor hired by the roofing Contractor Additional project details may be discussed at the pre-bid conference Permit fees shall be included in the bid

2. MOBILIZATION AND SITE PROTECTION Mobilize and prepare site for construction Protect all building openings during construction Provide temporary weather protection as required Protect surrounding property, vehicles, landscaping, and structures Maintain clean and safe jobsite at all times Provide daily cleanup and final cleanup upon completion

3. DEMOLITION AND REMOVAL Contractor shall: Remove and properly dispose of existing metal roofing system including: o Batten lock metal roof panels o Existing underlayment and felt paper o Fasteners and associated components Remove and dispose of all flashing and roof accessories as required and properly disposed of at the expense of the Contractor

4 RFP #26-06 SHERIFFS SUBSTATION ROOF REPLACEMENT Dispose of all debris in accordance with applicable regulations

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 823525 | Published 5/11/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208