Fernandina Beach Marina Redevelopment, Fernandina Beach, FL
- Owner Reference
- 26-10
- Bid Date
- Jul 2, 2026 at 02:00pm
- Questions Due By
- June 17, 2026 5:00 PM
- Pre-Bid
- MANDATORY - 6/3/2026 @ 10:00am @ (for location please or )
- Owner
- City of Fernandina Beach, FL
- Trades
- CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Dock Construction, Fishing Piers, Marine Boat Lifts, Fender Systems, Wharf, Berths, Pile Moorings, Boardwalks
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 460 calendar days
Description
The City of Fernandina Beach Riverfront Resiliency Project is the continuation to protect Historic Downtown Fernandina Beach from Blue Sky Tide Flooding, Sea-level Rise, and Storm Surges. Fernandina Beach Marina Redevelopment consist of the following. The demolition of Brett's Waterway Cafe and the removal of debris falling into the river; dredging; a new pier is to be constructed to have the entrance be more in align with Center Street with a single entrance to the marina including improved site views. The location of the pier will allow the construction of the new pier to occur while the existing pier remains open. Then the demolition of the existing timber pier and reconnecting of floating docks E and F. Also, the proposed project will consist of a new concrete bulkhead and wooden boardwalk constructed over the water to replace the existing boardwalk and failing bulkhead under Brett's. The new bulkhead appearance and finish to match phase one of the Fernandina Beach Riverfront Resiliency Project which will be a concrete finish with recess amber lighting.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825542 | Published 5/22/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208