Water Treatment Plant VFD Replacement Project, Gainesville
- Bid Date
- Jun 25, 2026 at 02:00pm
- Pre-Bid
- MANDATORY - 5/28/2026 @ 01:00pm @ (for location please or )
- Owner
- City of Gainesville, GA
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The Project will consist of Work occurring at two different sites. Work at Riverside WTP consists of the following major elements: Demolition of the existing high service pump No. 6 and raw water pump No. 4 motor control centers and variable frequency drives and the installation of the new high service pump No. 6 and raw water pump No. 4 motor control centers and variable frequency drives. Work at Lakeside WTP consists of the following major elements: Demolition of the existing high service pump No. 1 motor control center and variable frequency drive and the installation of the new high service pump No. 1 motor control center and variable frequency drive.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 824826 | Published 5/19/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208