10.4 Miles of Bridge Repairs and Resurfacing on I-55/I-70/US 40, Madison County, IL
The proposed improvements consist of a SMART resurfacing of all lanes and shoulders in both directions of the interstate between the project limits. Patching and guardrail improvements within the project limits will also be performed. The bridges on SNs 060-0012 & 060-0013 will receive bridge joint replacements, bridge deck overlays, and approach pavement resurfacing. The work will be performed with nighttime lane closures and interstate directional closures for the staging. The project is located along I-55/I-70/US 40 near Collinsville, from 0.5 miles west of Black Lane to 0.4 miles east of IL 159; including ramps at Black Lane, IL 157, and IL 159, in Madison County. The bridge repairs are located along I-55/I-70/US40 over IL 157 on SNs 060-0012 and 060-0013. The net length of the project measures approximately 30,570 feet (5.79 miles) along the centerline of I-55/I-70/US 40.