Sand Bid, DeRidder, LA
Sand for Beauregard Parish Police Jury 201 West Second Street, DeRidder Louisiana
Need an account?
Remembered your password?
Already have an account?
Sand for Beauregard Parish Police Jury 201 West Second Street, DeRidder Louisiana
Washed Pea Gravel for Beauregard Parish Police Jury 201 West Second Street, DeRidder Louisiana
Nashville B Fire Pump Intake Repairs for The Port of New Orleans LA
Purchase and Delivery of Twenty-Two (22) Steel Pipe Piles for Upgrades to the Julia Street Cruise Wharf, Port of New Orleans LA.
Pest Services for School Food Service, Iberville Parish Schools, LA
The project consists of the replacement of the metal roofing at the Port of Morgan City Multi-Modal Warehouse Building. Location: Morgan City Harbor and Terminal District 7327 Louisiana Highway 182 Morgan City, LA 70380
21,435 LF Joint and Crack Cleaning and Sealing, 29,741 SY Double Application Textured Bituminous Surface Treatment, 64,517 SY Single Application Textured Bituminous Surface Treatment, 35,662 SY Asphalt Rejuvenator Surface Treatment, & Associated Thermoplastic Pavement Marking within the City of Broussard.
Watson Branch Chiller Replacement - Location: Watson Branch Library located at 36251 Outback Road, Denham Springs, Louisiana 70706
Parker Road Widening (PR 929 to Fountainbleau Road) Parish of Ascension Government LA
Woodland Waste Water Treatment Plant Demolition
South Apron Expansion - Phase 3 - Construction Phase 2 will be received by the England Economic and Industrial Development District at 1611 Arnold Drive, Building 1803, Alexandria, LA 71303
The work consists of furnishing all labor, material and equipment for selective demolition, installation of piling, construction of pile caps, and installation of mooring bollards as per the drawings and specifications provided in the Bidding Documents. The site is located at the Julia Street Wharf in New Orleans, Louisiana.
South Central Planning and Development Commission Building Expansion - 5058 West Main Street Houma, Louisiana 70360
This project will consist of the Construction of new regulation basketball court with acrylic surfacing and bleachers. Demolition of existing concrete flatwork, asphalt pavement, drainage structures. New Asphalt parking lot with limestone base course, concrete sidewalks and vehicular drive. Installation of three (3) new drop inlets and approximately 195 linear feet of 15 -inch reinforced concrete pipe arch (RCPA) storm drain, construction of a detention swale. ADA parking striping, signage, parking barriers, and site restoration.