Streambank Stabilization and Aquatic Habitat Restoration, Rochester Hills, MI
- Owner Reference
- RFP-RH-26-037
- Bid Date
- Jul 15, 2026 at 03:00pm
- Owner
- City of Rochester Hills, MI
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Limnology & Inland Water Restoration: Reservoirs, Lakes, Streams, Ponds, Rivers, Barriers, Aquatic Plants, Wetlands Living Shore, Design/Build Contractor; Design/Bid/Build Entity (DBBE) or Design/Bid/Build (DBB)
- Phase
- Contracted Services & Suppliers
- Duration
- 3-year contract with 2 optional 1-year renewals
Description
The primary objective of this contract is to utilize a streamlined Design-Build method to address localized, minor-to-moderate streambank erosion, lateral bank migration, and habitat degradation. This contract is explicitly intended for maintenance-level and adaptive restoration projects that do not justify the timeline or financial overhead of a traditional Design-Bid-Build procurement.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 829473 | Published 6/18/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208