Drives & Sidewalk Restoration Program (Phase II), Cameron, MO
Generally, the work consists of repairs and replacement to a number of Drives and Sidewalks.
Need an account?
Remembered your password?
Already have an account?
Generally, the work consists of repairs and replacement to a number of Drives and Sidewalks.
The proposed work includes: Replacing BR# 3400008 on Bennett Road over Flat Creek with a new 124 11 single span Concrete NU-Girder bridge and associated roadway work. All bidders must be on MoDOTs Qualified Contractor
The scope of this project is to provide security services for Hazelwoods two recreation centers, Civic Center East and the Community Center, for the 2027 fiscal year.
The proposed work includes: Removal of an existing bridge and the construction of a new 200-foot, two-span, prestressed concrete NU girder bridge. A precast concrete box culvert, guardrail, riprap, and permanent erosion control will be installed along with any other incidental work in accordance with the plans and specifications.
The construction shall include all work incidental to the furnishing of materials, tools, equipment and labor necessary to construct the roadway improvements along with a multi-use path, pavement widening, curb and gutter, curb ramps, drainage structures and other appurtenances.
The proposed work includes sidewalk improvements South side of E 2nd St from S Grand Ave. to S Weber Ave. Then, continues on West side of S Weber Ave. from E 2nd St. to E 6th St. Also includes sidewalk improvements West of S Edison Ave. from W Front St. to W 2nd St. Installation of approximately 1,900 total linear feet of 5 wide, ADA compliant sidewalk.
The proposed work includes: The construction of a new 71 foot 9 inch single span prestressed Concrete NU-Girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work in accordance with plans and specifications.
The Scope of Work includes sidewalk installation, grading, and storm sewer improvements.
Total Small Business Set-Aside, 561730 - Landscaping Services. Grounds Maintenance Services for the St. Louis VA Medical Center Jefferson Barracks in accordance with the Performance Work Statement (PWS). PoP 7/13/26 - 7/12/31
The proposed work includes: BRO-R063(11) bridge project on CR 213 over Fly Creek: Demolition, grading, 3-span (33-39-33) Prestressed Concrete I-Girder bridge, slope protection, asphalt surface roadway, guard rail, and incidental work. Work may not begin earlier than September 8, 2026, but also cannot begin until construction completion of the Route 42 bridges estimated to be complete in early September 2026.
The proposed work includes the installation of new 10' trail, retaining wall, fencing, and pedestrian bridge over US-169 in Clay County, MO.
The proposed work includes: Hydro demolition of existing bridge deck and installation of Latex Modified Concrete on entire surface of Urich Road Bridge over Town Creek (Bridge 0895003 Federal ID 15275).
The proposed scope of work includes along North Sappington Road from West Lockwood Avenue to Manchester Road consisting of new decorative crosswalks, resurfacing the roadway, as-needed replacement of concrete sidewalk including ADA compliant curb ramps, as-needed replacement of concrete curb and gutter, driveway approach replacement, inlet/manhole adjustments, side street intersection widening, new pedestrian signal, sodding, pavement markings, and other appurtenances.
The Scope of Work includes the construction of approximately 8,059 lineal-feet of pavement work including mill and overlay, road widening, curb and gutter, new sidewalk, and other incidental items and work described in the Project Manual, or reasonably inferable therefrom.
The Scope of Work includes replacement of existing Bridge No. 4540006 with a new single span (58-6) prestressed concrete girder bridge and associated approach roadway work and provides for bridge removal, bridge construction, traffic control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. Audrain County anticipates issuing notice to proceed in the Fall of 2026.
Franklin County Sheriff and Hwy Departments are seeking bids for a newlly built training facility in Beaufort, Mo.