South Lafayette Street Waterline Replacement Project, Shelby, NC
- Bid Date
- Jun 4, 2026 at 03:00pm
- Pre-Bid
- Scheduled, Optional - 5/21/2026 @ 11:00am @ (for location please or )
- Owner
- City of Shelby, NC
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The proposed work consists of: The installation of approximately 2,600 linear feet of 8-inch ductile iron water line to replace the existing 6-inch cast iron water line. The work is to occur along South Lafayette Street (NC State Route 18), from the intersection of Ramblewood Drive and Morton Street to the intersection of Broad Street and South Morgan Street. The installation of the 8-inch water main alignment also involves connecting to several smaller water mains and serves along the length of construction. The project work also includes removal of eight existing sanitary sewer manholes, installation of new manholes, and sanitary service line connections.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 826026 | Published 5/26/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208