Kings Ridge Drive Sidewalk Gap Project, Charlotte, NC
- Owner Reference
- 269-2026-216
- Bid Date
- May 13, 2026 at 01:00pm
- Questions Due By
- 5/6/2026 @ 1:00pm
- Pre-Bid
- Strongly Encouraged - 4/24/2026 @ 11:00am @ (for location please or )
- Owner
- City of Charlotte
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 90 calendar days
Description
Project includes the construction of sidewalk to close an existing sidewalk gap along Kings Ridge Drive. Work includes grading, installation of concrete sidewalk, ADA-compliant curb ramps, curb and gutter, asphalt pavement, and adjustment of existing utilities as shown within the drawings and specifications.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 819358 | Published 4/15/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208