Burson Bridge Replacement Project, Charlotte, NC
- Bid Date
- Jun 23, 2026 at 11:00am
- Pre-Bid
- MANDATORY - 5/26/2026 @ 10:00am @ (for location please or )
- Owner
- University of North Carolina Charlotte (UNCC), NC
- Trades
- *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
This project consists of structural repairs and waterproofing replacement at a pedestrian bridge at Burson Hall (to be known as Honeywell Innovation Hub) on the campus of UNC Charlotte. The building is located at 9006 Craver Road, Charlotte, NC. The scope of the project includes structural repairs to the bridge superstructure and the installation of a new trench drain and expansion joint. The scope also includes removing and replacing the precast panels and demolition and replacement of the bridge topping slab. The project includes all other work as shown, indicated, or reasonably implied on the drawings and/or specifications for a complete, first-class job.
Bonds required.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825527 | Published 5/22/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208