Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#826540 Posted 5/29/2026

Electrical Grid Automation Project Phase 1 Rebid, Charlotte, NC

Bid Date
Jun 4, 2026 at 11:00am
Pre-Bid
Scheduled, Optional - 4/21/2026 @ 01:00pm @ (for location please or )
Owner
University of North Carolina Charlotte (UNCC), NC
Trades
High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Work includes new medium voltage switchgear and replacement padmount switchgear for SUB SW-1 within the existing main substation yard providing power to most of the campus. The scope shall include phased installation of the new switchgear to be fed from the existing Duke Energy transformer secondary and serve the replacement padmount switchgear and existing to remain padmount switchgear.

Bonds required.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 826540 | Published 5/29/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208