Browse all Lane County, OR
Rice Road Pipeline Improvements Project, Mapleton, OR
Hult Center Seating, Electrical and Mechanical Improvements, Eugene, OR
Suzanne Arlie Park Trailhead, Parking, and Road Widening, Eugene, OR
Jessen Substation Rebuild, Eugene, OR
Project Description: construction services to rebuild the Jessen substation. Work will consist of demo of the existing substation, site grading, substructure, control house construction, and materials purchase for EWEB to continue work after the contract is complete.
Vine Maple, Spring, Pine Canyon, Huckleberry & South Ridge Paving, Eugene, OR
Cesar Chavez Chiller Replacement 2026 Project, Eugene, OR
Demolition of existing air-cooled chiller, and associated outdoor piping and electrical conduit and wire. Installation of replacement chiller of same type and approximately same size in same location as original. Installation of new piping and electrical conduit and wiring to new chiller as required, and all related accessories. Startup, testing, adjusting & balancing. Training of District Facilities O&M Staff.
Amazon Prairie Mitigation Bank - Phase 2, Eugene, OR
As-Needed Fencing Services, Eugene, OR
Description: EWEB requires as-needed commercial fencing services for various EWEB departments, including installation, repairs, and rentals.
Adams Substation Fencing, Eugene, OR
Scope of Work: removal of the existing substation perimeter fence and installing a new 8' non-conductive perimeter fence along with associated fence curbs at the Adams Substation at 249 Adams Street, Eugene, OR 97402.
North Adams Overlook Removal, Eugene, OR
Scope of Work: Dewatering due to work within Willamette Riverbed. Removal of Overlook structure. Temporary pedestrian and traffic control. Tree protection. Minor bank grading. Lawn restoration.