Wattley Park Stream Bank Stabilization, McKinney, TX
Wattley Park Stream Bank Stabilization.
Need an account?
Remembered your password?
Already have an account?
Wattley Park Stream Bank Stabilization.
Furnishing all labor, material and equipment, and performing all work required for construction of approximately five thousand seventy-seven (5,177) 1-inch single service water lines, twenty-five (25) 1 -inch single service waterlines, and seventy-six (76) 2-inch single service water lines, together with all necessary appurtenances, by using a trenchless installation method (directional drilling, pipe bursting, or push/pull insertion) without open-cutting the roadway or driveway. Service lines shall be classified as either short service lines or long service lines. A short service line shall mean an existing service line connecting to the water meter that is located on the same side of the street as the water main. A long service line shall mean an existing service line connecting to the water meter that is located on the opposite side of the street from the water main.
Utility Improvements for Rivina Lift Station & Offsite Force Main and Gravity Main.
The City of Allen, Texas is seeking a qualified contractor to provide Building Inspection Services.
Paving Improvements for Lakeside Grove, Phase 1.
Utility Improvements for Lakeside Grove, Phase 1.
Surface preparation and recoating of the interior and exterior of the 2.5-million-gallon Elevated Storage Tank. (2) Structural repairs and modifications as detailed in the plans. (3) Approximately 320 linear feet of storm drain piping. (4) Incorporating an active mixing system with provisions for future chloramine boosting. (5) Electrical and miscellaneous site improvements. The Timber Ridge Elevated Storage Tank is located at 6050 Timber Ridge Drive, Frisco, TX 750.
The City of Plano is soliciting Building 059 - Fire Station No. 7 Re-Roof.