The City of Corpus Christi (City) hereby issues this request for bids (RFB). The City is seeking bids from firms interested and qualified in 55-gallon rain barrels. The rain barrels are used to assist the homeowners with their water conservation efforts. Corpus Christi Water (CCW) offers a rainwater harvesting program that allows customers to purchase a rain barrel at a reasonable price directly from the City. The term of this contract will be for three year.
Post Date: 05/21/2026Bid Date:06/01/2026Trades: Suppliers: Supplies/Rental/Delivery of Construction Related, Construction Dependent or Construction Equipment, Water Conservation Plan (WCP), Urban Water Management Plan (UWMP)
This is a solicitation for contractors interested in entering into a State Let Construction Contract to provide bridge maintenance on various bridges at various locations in Goliad & Karnes Counties, TX. This is not a Federal Aid Project.
Post Date: 05/20/2026Bid Date:06/02/2026Trades: Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Flour Bluff Independent School District (FBISD or District) is soliciting proposals from qualified firms to provide Construction Manager-at-Risk (CMAR) services through a one-step Request for Proposals (RFP) process in accordance with Texas Government Code Chapter 2269, Subchapter F, Section 2269.253(d). This procurement includes multiple projects under the Districts program, including Auditorium Renovation, Wetlands Improvements, District-Wide Door Replacement, Primary School Building Addition, Central Plant Construction, and Junior High Locker Room Renovation.
Post Date: 05/06/2026Bid Date:06/03/2026Trades: *At Risk Construction Management CMaR: Owner's Representative Services NIGP 925-44
Demolition of the existing walking beam flocculators, replacement with new vertical turbine mixers, and construction of the associated structural upgrades in Plant 1 (Basins 1 and 2) for the new flocculators. A new electrical building, PCR-14, is to be constructed for the new vertical flocculators. Additionally, construction of new baffle walls in the secondary sedimentation basins of Plant 1.
Post Date: 05/27/2026Bid Date:06/03/2026Trades: Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
1. Improvements to Room 1034 at Corpus Christi International Airport. a. Improvements include, but are not limited to, relocation or disposal of existing equipment and finishes; coordination with City Procured Contractor tasked with CT- 80 machine and appurtenances relocation to renovated Room 1034; Contractor to furnish and maintain appropriate and adequate dust control around scanning equipment during construction activities; floor repair where the existing TSA screening equipment is removed from ticketing lobby area; removal and storage or disposal of lights / diffusers as required for new fixtures; modifications to walls to accommodate for oversized baggage and TSA work space;Construction of one (1) opening in the exterior masonry wall of the terminal building for a 6-ft roll up door; Installation of appropriate doors and / or draft curtains for baggage handling equipment; Installation of baggage conveyor equipment from interior ticketing area to exterior of the terminal building for baggage and installation of appropriate doors and / or draft curtain, doors and draft curtain to be Windstorm Compliant; removal, salvage, and storage of existing rollup door on the exterior and fill in door space with masonry that matches existing exterior masonry wall; Installation of new electrical circuits for baggage equipment, to drop down from ceiling OR sawcut and extend service from existing check-in counter to new baggage equipment location; Furnish and install appropriate LED lighting and switches; Furnish and install security improvements, including but not limited to, access control card readers, cameras, panic bar hardware on doors as noted; Furnish and install exterior wall insulation and finish gypsum board, including tape/float/texture/paint; Furnish and install acoustic dropdown ceiling; Cleaning of existing floor and installation of new flooring. 2. Exterior Overhead Canopies for Rooms 1034 and 1044: a. Construct overheard canopies on the airside exterior of the Terminal Building. New canopies to include gutter system and lighting. Installation of oscillating fans under existing canopy structures. The Work includes Contractor providing a structure that is Windstorm Certification compliant as follows: 1) WINDSTORM CERTIFICATION: Project is in a designated catastrophe area and must obtain appropriate windstorm certification for Exterior Overhead Canopies and any other component that requires windstorm certification. a) Windstorm Information and Requirements. (1) 150 mph 3 second gusts, must uphold to new windstorm Code. (2) Contractor to submit Texas Department of Insurance (TDI) Application for Certificate of Compliance. (3) WPI-1; For New Construction or substantial alterations or additions to existing structures. (4) WPI-2; For alternations to existing building. (5) Email address: [email protected], (6) Website: https://www.tdi.texas.gov/wind/adopted-codes.html, (7) Risk Category I, (8) Minimum ultimate wind speed: 137 mph, (9) Exposure Category D. 3. Inbound Ticket Counter Conveyor (Room 1044 West Side) a. Construct inbound Ticket Counter Conveyor equipment on the West Side SA CT- 80 Scanner (Room 1044). Connection to existing conveyor system and other improvements as noted in the associated drawings.
Post Date: 05/27/2026Bid Date:06/03/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, Masonry Contractor, Precast Concrete; Mortar Repair, Tuckpointing, Brick Pointing, Finishing Joints, Stone Masonry Contractor: Block Wall, Chimneys, Retaining Walls, Low Voltage Electrical Contractor (LVE) <91V: Electrician, Fiberoptic, Wire & Cabling, Telephone, Cable Television (TV), Awning Contractor: Canopies, Carports, Shade Structures, Patio Covers, Pergolas, Arbors, Trellises, & Soffit, Raingutters Installation Contractor: Cladding, Siding & Decking: Installation & Repairs; Pressure Washing Buildings, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors