Browse all Salt Lake County, UT
Salt Lake Valley Transfer Station PT Deck-Pit Repair, Salt Lake City, UT
The Work of the Project is defined by the Contract Documents and consists of the following: The Work includes all of the work of Divisions 01 thru 33 for the Salt Lake County Salt Lake Valley Transfer Station PT Deck/Pit Repair. Project Description: Repair the Post Tension Concrete Deck surface and to replace and repair the pit surround with a metal treatment.
Hunter Park Trail Connection, West Valley City, UT
Construction of a new concrete trail including site preparation, grading, and installation of associated hardscape elements within the construction drawing limits. The project includes a Base Bid and Bid Alternates 1, 2, and 3, along with adjustments to impacted irrigation. All disturbed areasincluding landscaping, surfaces, and finishesshall be patched and repaired.
Professional Engineering Services, Salt Lake City, UT
Metro Water advertises annually, typically in February, the possible need for generally small-purchase design professional services. Metro Water may also forecast requests for SOQs for larger design professional services.
Thornton North Metro Training Center Feasibility Study, Riverton, UT
hornton Fire Department (TFD) and North Metro Fire Rescue District (NMFR) are exploring opportunities for long-term collaboration regarding training facility operations. This Project includes a comprehensive feasibility study examining the viability, structure, and strategic implications of a joint training facility partnership. Consultant shall assess operational, financial, governance, and facility planning considerations to provide both agencies with data-driven recommendations for establishing a sustainable, mutually beneficial training partnership
Waterlines Relocation Project – Trestle Lane, Riverton, UT
The City of Riverton is inviting bids for the labor, materials, tools, and equipment necessary to complete the Waterlines Relocation Project Trestle Lane.
Remove Fluoride Pumping Systems, Riverton, UT
The City would like to remove the fluoride pumping systems at two separate wells. At each location work will include removal and disposal of 1000 gallon bulk tank, 50 gallon day tank, and all associated pumps, gauges, dampeners, calibration columns, piping, etc.