Hydraulic Control Unit Refrubishment, Richland, WA
- Owner Reference
- 715349
- Bid Date
- Jul 8, 2026 at 02:00pm
- Questions Due By
- May 27
- Owner
- Energy Northwest, WA
- Trades
- *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Contractor shall provide qualified, trained, and experienced personnel to perform the HCU refurbishment. Disassembly, inspection, and functional testing of HCUs, Accumulator replacements, Directional control valve replacement, Actuator soft parts replacements, Solenoid valve replacements, Valve refurbishment, Six HCUs shall require accumulator replacements, Cleaning, refurbishment, and replacement of worn components, Reassembly and documentation in accordance with station procedures and applicable codes and, Perform all post maintenance testing. This may include, but not be limited to operation of all equipment necessary to perform post maintenance testing. Technical Representative or designee with a detailed project schedule no less than 90 days prior to Work starting.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825396 | Published 5/22/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208