2025 Tigner Road PRV Station Replacement, Cashmere, WA
- Bid Date
- Jun 3, 2026 at 11:00am
- Owner
- City of Cashmere, WA
- Trades
- Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Grates, French Drains, Dewatering, Water Swales
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- Aug. 21, 2026
Description
Work to be performed includes: removing existing landscaped area, concrete sidewalk, curb and gutter, asphalt, existing pressure reducing valve station and associated piping to install new PRV enclosure and mechanical, connecting the PRV to the existing system and restoration of restoration of vegetation, concrete, and asphalt.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 825173 | Published 5/20/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208