Phase 4 - Northwest School of Wooden Boatbuilding (NWSWB) and Star Marine On-Site Grinder Pump Installation for the Port Hadlock Urban Growth Area (PHUGA) Sewer System, Port Hadlock, WA
This contract provides for the installation of on-site grinder pumps for the Northwest School of Wooden Boatbuilding and associated school buildings, which also includes seven (7) cabins and Ajax's Cafe; and Star Marine. The work also includes the connection to the existing low pressure sewer (LPS) collection system; the installation of 2-inch HDPE LPS collection pipe, 2-inch HDPE low pressure "side sewer" pipe, grinder pump tanks, grinder pumps and control panels; the connection to existing building drains and appurtenances; the startup and testing of the grinder pumps; the abandoning of the existing septic tank systems' clearing and grubbing; the placement of hot mix asphalt and cement concrete sidewalks; and other work.