Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#821403 Posted 4/28/2026

Roof Replacement at Surrey Downs, Bellevue, WA

Owner Reference
AW2603131
Bid Date
Jun 24, 2026 at 11:00am
Pre-Bid
Strongly Encouraged - 5/18/2026 @ 11:00am @ (for location please or )
Estimate
$155,454
Owner
King County Housing Authority (KCHA)
Trades
*General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Work includes but is not limited to: 1. Good faith asbestos inspection(s) testing to comply with RCW 49.26.013 as required to achieve scope of work. 2. Removal and replacement of all existing roofing materials and 40 of plywood deck sheathing as well as 400LF of fascia board. 3. Inspect all exposed roof framing for any rot or damaged materials and repair as needed. 4. Block and seal any existing gable vents from attic interior. 5. Provide and install new CDX plywood deck sheathing and roofing materials according to manufacturers recommended installation specifications. 6. Provide and install all new approved roofing system components: a. Install approved Ice and Water shield roof underlayment to all critical areas and valleys. b. Install approved synthetic roof underlayment. c. Install approved composition roofing system. 7. Install Metal Roof Vent with minimum 50 sq.in Net Free Area ventilation. Total free area of ventilation must meet code requirements for attic ventilation. 8. Install Cor-A-Vent IN-Vent Attic Roof Vent or approved equal. Block eave vents after installation. 9. Install all metal 24-gauge flashing components according to manufacturers recommendations including roof penetration flashing, roof to wall flashing, eave and rake flashings and W-Valley flashing. 10. Install permanent fall arrest/restraint roof anchors and all other accessory items to complete the installation and maintenance of the roof in a safe and secure manner. 11. Install new fascia boards where there is any decay or rot that would prevent the exterior paint to be applied and warranted. Include painting of all fascia prior to installation of new gutters. (See Section 1.5 UNIT COSTS for details.) 12. Install new 5 K-style aluminum gutters and 2x3 aluminum downspouts to match existing locations. 13. Haul away and dispose of all debris and demolished materials. 14. Include painting all b-vent flashings, roof accessories and lead pipe flashings as needed. 15. Daily cleaning and final cleaning of all trash and debris. 16. Prevailing wage rates to be included. 17. Acceptable roofing products must meet these warranty requirements: Contractors workmanship warranty for a period of two (2) years from final completion. Subcontractors labor and materials for a period of two (2) years from final completion. Roofing manufacturers warranty of 100% materials and labor for five (5) years without proration or reductions. Roofing manufacturers 40-year warranty for materials. 18. Provide all applicable permits.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 821403 | Published 4/28/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208