NE 70th Street Crosswalk, Redmond, WA
- Owner Reference
- 2209
- Bid Date
- May 21, 2026 at 11:00am
- Estimate
- $560,000 - $680,000
- Owner
- City of Redmond
- Trades
- Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
- Phase
- New Construction, Addition, Expansion
Description
Work to be performed shall include: Construction of a new crosswalk across the north leg of the Redmond Way and NE 70th Street intersection, including but not limited to reconstruction of sidewalks, curb ramps, and pavements; paving a new traffic island in the intersection; modifications to a traffic signal system; illumination system, including poles, foundations, conduits, junction boxes, and wiring; and traffic control and detour routing and other work necessary to complete the project.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 822824 | Published 5/6/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208