The University of Washington, through its Facilities department (UWF), is soliciting bids for the replacement of the roof system at the Olympic Natural Resources Center (ONRC), Building B (Main Building), located at 1455 S. Forks Ave. Forks, WA 98331. All work shall comply with University of Washington Facilities standards and all applicable codes.
This project shall consist of: Pavement repair, slurry seal, curbing, removal and replacement of traffic markings, and traffic signal modifications on 20th Avenue S and on S 308 Street.
Post Date: 05/22/2026Bid Date:06/12/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
The Project consists of tenant improvements to replace (5) indoor water source heat pumps on the first and second floors of the R Building and related scope. Alternate work: In general, the scope includes: Interior alterations to Building R to replace (5) indoor water source heat pumps in mechanical closets and above the ACP grid ceiling in rooms 103E, 103C, 106D, 110E and 218. The units will be replaced in kind with modification to piping, air distribution, and electrical systems as required. Architectural scope includes repairs to existing finishes and enclosures, and seismic improvements for above ceiling locations to meet the City of Bellevue code requirements. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Post Date: 05/22/2026Bid Date:06/16/2026Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
The 2026 Urban Forestry Improvements include removal of tree roots and landscape strip subgrade located within City right-of-way. Landscape strips will be restored with root barriers, topsoil, and drainage improvements. There will also be restoration of street signage, sod, and irrigation systems.
Post Date: 05/22/2026Bid Date:06/16/2026Trades: *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching
The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for construction of the 120th Avenue NE Roadway Rehabilitation Project. Specific work includes, but is not limited to, preparation and resurfacing of asphalt concrete roadway, cement concrete paving, pavement reconstruction, pavement repair, replacement of damaged cement concrete curb, gutter, driveway, and sidewalks, installation of ADA sidewalk ramps, erosion control, pavement markings, traffic signal loops, RRFB and pedestrian push button replacement and adjustments, traffic control and other work.
Post Date: 05/26/2026Bid Date:06/16/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Seeking professional services to design a water quality treatment facility which will add water quality functionality to approximately 80 acres of previously untreated impervious surface area that discharges directly to the Upper Sammamish River.
Post Date: 06/02/2026Bid Date:06/16/2026Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
Requires signalizing the ferry terminal intersection with Fauntleroy Way Southwest. The project includes traffic signals, illumination, intelligent transportation systems (ITS), signing, hot mix asphalt (HMA) paving, pavement marking, temporary erosion & pollution control, temporary traffic control and other work. Involves 50 items and 75 working days. Work class 9, traffic signals.
Post Date: 05/19/2026Bid Date:06/17/2026Trades: Traffic Signals, Calming, Intelligent Transportation (ITS): Automated Enforcement Systems (AES) & Speed Traffic Recorders (TMS)
Sound Transit is requesting Proposals from firms to provide the equipment, installation materials, and documentation necessary to replace the existing Public Address (PA) system at Sound Transits Sounder station(s).
Post Date: 05/19/2026Bid Date:06/17/2026Trades: Audio/Visual (AV) Contractor: Video Conferencing, Sound & Speakers, Cameras, Intercom, CATV, Public Address (PA) System
Yardley Arms is a three-story apartment community located in the City of Burien. Constructed in the 1970s, the building provides housing for seniors and disabled individuals aged 62 and older. The property contains a total of 67 dwelling units, all of which are one-bedroom, one-bathroom apartments. The Contractor is responsible for pricing the project, which must cover all labor, materials, and equipment. This includes mobilization costs, scaffolding, and the removal and disposal of existing windows, The scope of work involves the removal and replacement of all windows in the three-story building as indicated on the plan set. It is the Contractor's responsibility to verify the actual window sizes before placing any orders, as the drawings provided are for reference only and should not be scaled.
Work includes but is not limited to: 1. Good faith asbestos inspection(s) testing to comply with RCW 49.26.013 as required to achieve scope of work. 2. Removal and replacement of all existing roofing materials and 50% of plywood deck sheathing as well as 400LF of fascia board. 3. Inspect all exposed roof framing for any rot or damaged materials and repair as needed. 4. Block and seal any existing gable vents from attic interior. 5. Provide and install new CDX plywood deck sheathing and roofing materials according to manufacturers recommended installation specifications. 6. Provide and install all new CertainTeed roofing system components: a. Install CertainTeed Winterguard Ice and Water roof underlayment to all critical areas and valleys. b. Install CertainTeed Roof Runner synthetic roof underlayment. c. Install CertainTeed Landmark AR composition roofing system. 7. Install Gibraltar Building Products PRV50BL Plastic Roof Vent with minimum 50 sq.in Net Free Area ventilation. 8. Install Cor-A-Vent IN-Vent Attic Roof Vent or approved equal. 9. Install all metal 24-gauge flashing components according to manufacturers recommendations including roof penetration flashing, roof to wall flashing, eave and rake flashings and W-Valley flashing. 10. Install permanent fall arrest/restraint roof anchors and all other accessory items to complete the installation and maintenance of the roof in a safe and secure manner. 11. Install new fascia boards where there is any decay or rot that would prevent the exterior paint to be applied and warranted. Include painting of all fascia prior to installation of new gutters. (See Section 1.5 UNIT COSTS for details.) 12. Install new 5 K-style aluminum gutters and 2x3 aluminum downspouts to match existing locations. 13. Haul away and dispose of all debris and demolished materials. 14. Include painting all b-vent flashings, roof accessories and lead pipe flashings as needed. 15. Daily cleaning and final cleaning of all trash and debris. 16. Prevailing wage rates to be included. 17. Provide for 40 Year Manufacturers Warranty from CertainTeed, including Sure Start 5-Star Warranty and 2-Year Workmanship Warranty.
Work to be performed is described in the Contract Documents and includes: - Increase the outside diameter of the foundation to 98 feet and 1 inch (4 foot increase) to meet allowable bearing pressure - Install sixty 2-inch diameter anchors to prevent shell uplift - Install anchor bases around screen vent - Reservoir Coating - Add drain holes near base of guardrail posts - New inlet/outlet piping, inlet manifold with duckbill valves - Install anchor points at top of tank - Install sample lines - New roof vent, ladder, and guardrail - Relocate overflow pipe outside of tank and associated catchment system
Post Date: 05/26/2026Bid Date:06/18/2026Trades: Other Foundation, Structure, & Building Exteriors NAICS 238190
The project specifications include general planning, removal and replacement of existing ground cover and site irrigation for a complete project constructed under a single prime contractor. The awarded contractor shall provide all permits, materials, equipment, supervision and labor.
Post Date: 06/03/2026Bid Date:06/18/2026Trades: *Landscaping Contractor & Groundskeeping, Xeriscaping, Hardscaping, Weed Control Grubbing Sodding Lawn Mowing Mulching
The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for construction of the 2026 STREET OVERLAY PROJECT. Specific work includes, but is not limited to, replacement of damaged cement concrete curb, gutter, entrances and sidewalks, installation of ADA sidewalk ramp, erosion control, preparation and resurfacing of asphalt concrete roadway, pavement repair, pavement markings, traffic signal loops, traffic control and other work.
Post Date: 06/04/2026Bid Date:06/18/2026Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
Proposals from firms to provide on-call fence maintenance/repair service for Sound Transits properties throughout service areas in Snohomish, King and Pierce counties. The term of the contract will be for five (5) years.
Post Date: 05/26/2026Bid Date:06/22/2026Trades: Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, Tide Gates
The purpose of this contract is to provide construction management and inspection services on a work order basis for King County Department of National Resources and Parks, Parks and Recreation Division. The exact disciplines required and the amount of work for each discipline has not been determined. The Consultant should be capable of adding disciplines expeditiously as necessary to meet the needs of specific work orders. There is no guarantee that all services in this Scope of Work will be used.
Post Date: 05/22/2026Bid Date:06/23/2026Trades: *Construction Management; General Contractor CM/CMGC/CMaC: Owner's Representative Services NIGP 925-44, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Work consists of the replacement of sixteen (16) exterior decks, the supporting walls between the decks, railings, siding, flashing, deck membranes, painting and other related assemblies to match new decks completed in previous phases. The lower floor patio is off-line as the two decks above are reconstructed. The patio (lower floor) gets a new post to support above structures and will be blocked off from residents use until completion above, and other tasks as listed in the bid documents.
Post Date: 05/26/2026Bid Date:06/23/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Work includes but is not limited to: 1. Good faith asbestos inspection(s) testing to comply with RCW 49.26.013 as required to achieve scope of work. 2. Removal and replacement of all existing roofing materials and 40 of plywood deck sheathing as well as 400LF of fascia board. 3. Inspect all exposed roof framing for any rot or damaged materials and repair as needed. 4. Block and seal any existing gable vents from attic interior. 5. Provide and install new CDX plywood deck sheathing and roofing materials according to manufacturers recommended installation specifications. 6. Provide and install all new approved roofing system components: a. Install approved Ice and Water shield roof underlayment to all critical areas and valleys. b. Install approved synthetic roof underlayment. c. Install approved composition roofing system. 7. Install Metal Roof Vent with minimum 50 sq.in Net Free Area ventilation. Total free area of ventilation must meet code requirements for attic ventilation. 8. Install Cor-A-Vent IN-Vent Attic Roof Vent or approved equal. Block eave vents after installation. 9. Install all metal 24-gauge flashing components according to manufacturers recommendations including roof penetration flashing, roof to wall flashing, eave and rake flashings and W-Valley flashing. 10. Install permanent fall arrest/restraint roof anchors and all other accessory items to complete the installation and maintenance of the roof in a safe and secure manner. 11. Install new fascia boards where there is any decay or rot that would prevent the exterior paint to be applied and warranted. Include painting of all fascia prior to installation of new gutters. (See Section 1.5 UNIT COSTS for details.) 12. Install new 5 K-style aluminum gutters and 2x3 aluminum downspouts to match existing locations. 13. Haul away and dispose of all debris and demolished materials. 14. Include painting all b-vent flashings, roof accessories and lead pipe flashings as needed. 15. Daily cleaning and final cleaning of all trash and debris. 16. Prevailing wage rates to be included. 17. Acceptable roofing products must meet these warranty requirements: Contractors workmanship warranty for a period of two (2) years from final completion. Subcontractors labor and materials for a period of two (2) years from final completion. Roofing manufacturers warranty of 100% materials and labor for five (5) years without proration or reductions. Roofing manufacturers 40-year warranty for materials. 18. Provide all applicable permits.
Post Date: 04/28/2026Bid Date:06/24/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Base Bid: Renovations and upgrades to existing restrooms, laundry room and replacement of existing HVAC system. Work includes, but is not limited to, demolition of existing architectural, plumbing, HVAC, fire sprinkler, fire alarm and electrical elements, and installation of new architectural, plumbing, HVAC fire sprinkler, fire alarm and electrical elements. Alternate 1 Fire Alarm Replacement: Work includes, but is not limited to, a full new bidderdesigned, addressable fire alarm system to replace existing zoned system in its entirety. New system shall comply with all local regulations and codes, and include an annunciator panel in main lobby, combo CO/Smoke detection in sleep rooms, and smoke detection in all electrical/mechanical spaces. Alternate 2 Downspout Connection to Existing Tightline: Extend existing tightline and connect new down spouts to new tightline. Work includes, but is not limited to, extension of existing tightline, restoration of existing landscaping and replacement of existing pavement.
Post Date: 05/27/2026Bid Date:06/24/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Fire Protection: Fire Alarm, Smoke Detection & Fire Suppression Contractor, Fire Extinguishers, Pumps, Hydrants & Inspections
Construction of a new public restroom at Licton Springs Park, including associated site work, hardscape and landscape improvements, and utility connections.
Post Date: 05/28/2026Bid Date:06/24/2026Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
The existing electrical panels were observed to be original panels and are approaching the end of their Estimated Useful Life (EUL). Some panels have been replaced though out the building. It is recommended that the remaining original panels be replaced. Aluminum wiring was observed in dwelling unit electrical panels. It is assumed that the majority of the electrical branch wiring throughout the units is aluminum. In order to eliminate fire risks associated with aluminum wiring, it is recommended to install Alumiconn connectors at all aluminum to copper connections. This project will be bid and contracted in 2026; however, construction activities will not resume until the third quarter of 2027. Contractors shall prepare and submit bids accordingly, with all pricing, scheduling, labor, and material considerations reflecting a 2027 restart of work.
Post Date: 06/03/2026Bid Date:06/24/2026Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors