Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#816882 Posted 3/31/2026

Green Hill School Campus HVAC Improvements - Dept. of Children Youth & Families (DCYF), Chehalis, WA

Owner Reference
2025-085 G (1-1)
Bid Date
May 5, 2026 at 01:00pm
Questions Due By
Apr 27 at 1pm
Pre-Bid
Scheduled, Optional - 4/15/2026 @ 09:00am @ (for location please or )
Estimate
$5.6M - $6.2M
Owner
State of Washington Department of Enterprise Services (WADES)
Trades
HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The scope includes: 1. Construction of a 4-pipe air to water CO2 heat pump plant and associated pumps, supporting equipment, and piping distribution to three housing buildings (Spruce, Hawthorn, and Maple). 2. Retrofit of 12 air handling units (4 in each building noted above) with new supply and return fanwalls, hot water and chilled water coils, dampers, and filters. Construction must be phased for retrofit of 2 air handling units at a time, one building at a time. .New DDC system front located at the Central Plant Building Z with new DDC controls for the new central plant equipment and new DDC controls for Spruce, Hawthorn, and Maple. Demolition of any existing 400 hp fire tube hot water boiler from the central plant Building Z. Demolition of a portion of the Central Plant Building Z wall assembly and installation of a new roll-up service door and louvers in the same location. Site distribution of buried chilled and heat water piping from the Central Plant Building Z to the CO2 heat pump located on an new concrete equipment pad on site and to the Spruce, Hawthorn, and Maple Buildings. CMU block wall enclosure with fence and gate at the CO2 equipme

Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 816882 | Published 3/31/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208