South County – West Phase – 69kV Transmission Line, Winlock, WA

All bidders must prequalify before they can respond to this bid. The Public Utility District No. 1 of Lewis County (District) requires a contractor to provide labor, materials, and equipment to construct a new transmission line with distribution under build in Winlock, Washington. Note: Contractors shall be Prequalified by the District as Ab-High Voltage Transmission. The Prequalified Contractor list is available at: https://www.lcpud.org/vendors-contractors/pre-qualified-contractors/

Post Date: 05/20/2026 Bid Date: 06/04/2026 Trades: High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
#827216

RFSQ Historic Fire Station Renovation, Chehalis, WA

The City of Chehalis (City) is pursuing statements of qualifications for professional services from qualified engineers and architectural team to provide professional services for the feasibility of renovation and restoration of the Historic Fire Station. The historic Fire Station located at 455 Park Street is approximately 22,000 square feet and was constructed in 1925. The city intends to restore, update, and reoccupy the facility as an active Fire Station while preserving some of its historic character.

Post Date: 06/03/2026 Bid Date: 06/30/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#806843

Small Works Roster, Centralia, WA

Port of Centralia has established small works rosters for potential award of public works contracts below an estimated cost of $350,000. Vendors and contractors interested in having their business placed on one or more of the rosters shall submit one application specifying the categories of work for which they are qualified and wish to be listed.

Post Date: 01/31/2026 Bid Date: 12/31/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, All Other Specialty Trades (except foundation, structure, building exteriors, equipment, site prep, Other Specialty Trade: Installing/Servicing/Rebuild of Building Equipment (Excludes Electrical, Plumbing, HVAC equipment)
#816757

Green Hill School Campus HVAC Improvements, Chehalis, WA

For HVAC work at Green Hill School. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Post Date: 03/31/2026 Bid Date: 05/05/2026 Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
#816882

Green Hill School Campus HVAC Improvements - Dept. of Children Youth & Families (DCYF), Chehalis, WA

The scope includes: 1. Construction of a 4-pipe air to water CO2 heat pump plant and associated pumps, supporting equipment, and piping distribution to three housing buildings (Spruce, Hawthorn, and Maple). 2. Retrofit of 12 air handling units (4 in each building noted above) with new supply and return fanwalls, hot water and chilled water coils, dampers, and filters. Construction must be phased for retrofit of 2 air handling units at a time, one building at a time. .New DDC system front located at the Central Plant Building Z with new DDC controls for the new central plant equipment and new DDC controls for Spruce, Hawthorn, and Maple. Demolition of any existing 400 hp fire tube hot water boiler from the central plant Building Z. Demolition of a portion of the Central Plant Building Z wall assembly and installation of a new roll-up service door and louvers in the same location. Site distribution of buried chilled and heat water piping from the Central Plant Building Z to the CO2 heat pump located on an new concrete equipment pad on site and to the Spruce, Hawthorn, and Maple Buildings. CMU block wall enclosure with fence and gate at the CO2 equipme

Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.

Post Date: 03/31/2026 Bid Date: 05/05/2026 Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Duct Clean, Exhaust Systems, Air Handler/Air Chillers, RTU's
#819107

US 12, W Gulch Bridge to Rimrock Retreat - Paving, Lewis & Yakima Cos, WA

Requires planing bituminous pavement, crack sealing, paving with hot mix asphalt (HMA) pavement, constructing reinforced slopes; removing existing overlay from bridge deck, expansion joint modification, bridge deck repair, HMA joint seal at bridge end, and installing waterproof membrane at Bridge 12/289; removing existing overlay from bridge deck and constructing HMA joint seal at bridge end at Bridge 12/288, Bridge 12/304, and Bridge 12/306; installing concrete barrier and guardrail, replacing rumble strips, shoulder finishing, fog sealing, delineation, traffic control and other work. Involves 60 items and 95 working days. Work class 4, asphalt concrete paving. 12% SBE goal

Post Date: 04/14/2026 Bid Date: 05/06/2026 Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#819109

SR 508, 0.3 Miles East of Bergen Rd. Engineered Log Jam, Lewis Co, WA

Requires building two temporary in-water isolation systems, structure excavation, driving steel H-pile, placing large woody material, and restoration, traffic control and other work. Involves 65 items and 55 working days. Work class 1, clearing, grubbing, grading and draining. 18% FSB

Post Date: 04/14/2026 Bid Date: 05/06/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#818498

Willapa Hills Trail Fish Passage and Habitat Restoration at Willapa Hills State Park, Bunker, WA

This project includes repair the fish passage barrier found on the unnamed tributary to Willapa River that flows under Willapa Hills Trail in Lebam, WA. The scope of work for this fish passage restoration project will include but not be limited to site preparation including clearing & grubbing, culvert removal, trail fill excavation, stream construction slope establishment, pre-cast abutment installation, bridge installation, trail approach fill & gravel installation, bridge concrete finishing completion, planting & site cleanup, and associated utilities work (if any). Removal of the existing undersized 2 quantity 3 ft. diameter culverts and replacement with a 10 ft. wide by 100-foot-long bridge to correct the existing fish passage barrier. Major items included in the base bid (but not limited to) are: Trench Excavation Safety Provisions. Site Preparation. Trail Excavation & Stream Channel. Bridge & Abutment Installation. Site Cleanup. 10% for Minority Business Enterprises (MBE), 6% for Womens Business Enterprises (WBE), 5% for Washington Small Businesses, and 5% for Veteran-owned businesses. While meeting these goals is not mandatory, it is strongly encouraged to promote diversity in business participation.

Post Date: 04/10/2026 Bid Date: 05/12/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#819110

I-5, 1.2 Mi. S of Rogers Rd to SR 505 Vic. Paving, Lewis & Cowlitz Cos, WA

Requires grinding and inlaying travel lanes, pavement repair, guardrail repair, concrete barrier replacement, rebuilding a climbing lane, installing an underdrain system, traffic control and other work. Involves 63 items and 77 working days. Work class 4, asphalt concrete paving. 19% SBE goal

Post Date: 04/14/2026 Bid Date: 05/13/2026 Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#821665

REBID 2025 Roadway Treatments, Pe Ell, WA

This contract provides for the application of chip seal to approximately 1.2 total miles of various roadways throughout the Town. The improvements shall include, but are not specifically limited to, traffic control, grading, application of gravel, application of chip seal surface treatments, and related work items. The application of fog seal to these roadways shall be an additive schedule of work.

Post Date: 04/29/2026 Bid Date: 05/15/2026 Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path
#823156

Historical Museum Restoration & Preservation Project, Chehalis, WA

The work will include: Removal and replacement of the failed roof Installation of new flashing Repairs to roof sheathing and framing where water intrusion has caused damage Limited tuckpointing to restore deteriorated masonry and prevent further moisture infiltration that could affect the buildings historic interior plaster Upon completion, the buildings exterior envelope will be comprehensively restored and significantly improved in its resistance to water intrusion.
Post Date: 05/08/2026 Bid Date: 05/26/2026 Trades: Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards
#823157

Southwest Washington Fairgrounds Midway Drainage Improvements and Repaving Project, Centralia, WA

Key elements of the 2025 water system project included: Replacement of aging domestic water mains and water lines throughout the fairgrounds and park. Installation or replacement of isolation and control valves. Reconnection of the new main lines to the existing distribution system. Associated excavation, backfill, testing, and site restoration.

Post Date: 05/08/2026 Bid Date: 05/26/2026 Trades: Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
#823748

US 12, I-5 to 0.5 Mile East of Harms Rd Paving, Lewis Co, WA

Requires: grind and inlay the traveled surfaces of US 12 from 0.07 miles west of Bridge 12/221 to MP 77.48 with hot mix asphalt (HMA) 1/2" PG 58H-22, joints replacement, applying new membrane and new HMA on bridge No. 12/221, partial mill and fill for bridge 12/226 and paving above existing bridge 12/223.25 and bridge 12/224.25, traffic control and other work. The ADA features and APS buttons at the US 12/Jackson Hwy intersection will also be upgraded as part of this project. Involves 67 items and 51 working days. Work class 4, asphalt concrete paving. A federally funded contract with a 19% federal small business enterprise goal.

Post Date: 05/12/2026 Bid Date: 06/03/2026 Trades: Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path