Southwest Washington Fairgrounds Midway Drainage Improvements and Repaving Project, Centralia, WA
- Owner Reference
- 31-2609
- Bid Date
- May 26, 2026 at 02:00pm
- Pre-Bid
- Scheduled, Optional - 5/14/2026 @ 12:00pm @ (for location please or )
- Owner
- County of Lewis
- Trades
- Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- July 31
Description
Key elements of the 2025 water system project included: Replacement of aging domestic water mains and water lines throughout the fairgrounds and park. Installation or replacement of isolation and control valves. Reconnection of the new main lines to the existing distribution system. Associated excavation, backfill, testing, and site restoration.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 823157 | Published 5/8/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208