South County – West Phase – 69kV Transmission Line, Winlock, WA
- Owner Reference
- 26-039-PWB
- Bid Date
- Jun 4, 2026 at 02:00pm
- Pre-Bid
- Scheduled, Optional - 5/21/2026 @ 03:00pm @ (for location please or )
- Owner
- Lewis County PUD Public Utility District, WA
- Trades
- High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
All bidders must prequalify before they can respond to this bid. The Public Utility District No. 1 of Lewis County (District) requires a contractor to provide labor, materials, and equipment to construct a new transmission line with distribution under build in Winlock, Washington. Note: Contractors shall be Prequalified by the District as Ab-High Voltage Transmission. The Prequalified Contractor list is available at: https://www.lcpud.org/vendors-contractors/pre-qualified-contractors/
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 824947 | Published 5/20/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208