Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#822508 Posted 5/5/2026

WCCW - Replace Roofs Bldgs C, H, B, G, U & W - Department of Corrections, Gig Harbor, WA

Owner Reference
2026-304 G (1-1)
Bid Date
Jun 9, 2026 at 01:00pm
Questions Due By
May 28 at 1pm
Pre-Bid
MANDATORY - 5/19/2026 @ 10:00am @ (for location please or )
Estimate
$4.3M - $4.8M
Owner
State of Washington Department of Enterprise Services (WADES)
Trades
Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards
Phase
Renovation, Remodel, Improvements, Upgrades

Description

In general, the scope includes: 1. Building B: a. Removal of existing Built-up Roofing assembly down to existing structural roof deck. b. 2. Install new roofing assembly, as per architectural plans, with a new TPO single play roofing membrane. Building C: a. Removal of existing Built-up Roofing assembly down to existing structural roof deck. b. 3. Install new roofing assembly, as per architectural plans, with a new TPO single play roofing membrane. Building H: a. Removal of existing Single-ply Roofing assembly down to existing structural roof deck. b. 4. Install new roofing assembly, as per architectural plans, with a new TPO single play roofing membrane. Building G: a. Removal of existing Built-up Roofing assembly down to existing structural roof deck. b. 5. Install new roofing assembly, as per architectural plans, with a new TPO single play roofing membrane. Building U: a. Removal of existing Single-ply Roofing assembly down to existing structural roof deck. b. 6. Install new roofing assembly, as per architectural plans, with a new TPO single play roofing membrane. Building W: a. Removal of existing Single-ply Roofing assembly down to existing structural roof deck. b. Install new roofing assembly, as per architectural plans, with a new TPO single play roofing membrane. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 822508 | Published 5/5/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208