Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#823283 Posted 5/11/2026

Taylor Bay Outfall Installation, Longbranch, WA

Owner Reference
22848.02
Bid Date
Jun 1, 2026 at 02:00pm
Owner
Taylor Bay HOA, WA
Trades
Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Phase
New Construction, Addition, Expansion

Description

Installation of 1,500 linear feet of new 8-inch SDR-11 HDPE concrete-anchored outfall pipe and diffuser assembly in Case Inlet, South Puget Sound. With 1300-feet of submerged, surface-run pipe, 200-feet of intermittently submerged pipe through the inter-tidal zone, and a stub-out anchored to the bluff face at a minimum elevation of 15-feet for future connection. Alternate bid item included for installation of large woody debris to provide shoreline outfall protection.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 823283 | Published 5/11/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208