2026 Sanitary Sewer Pipe Replacement, Burlington, WA
- Bid Date
- Jun 16, 2026 at 10:00am
- Estimate
- $905,000
- Owner
- City of Burlington, WA
- Trades
- Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 50 working days
Description
This project includes the construction of approximately 590 linear feet of 12-inch PVC sanitary sewer pipe installation as well as the replacement of 600 linear feet of 12-inch concrete sewer pipe with 12-inch HDPE sanitary sewer pipe installed by pipe bursting. The project includes the installation of eight new manholes, and filling and rechanneling of existing manhole structures. The project includes temporary sewage pumping and site restoration all in accordance with the Contract plans and the specifications.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 826554 | Published 5/29/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208