Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#819633 Posted 4/17/2026

67th Avenue Sewer Interceptor Upsizing Phase 1, Arlington, WA

Owner Reference
P02.530
Bid Date
May 5, 2026 at 02:00pm
Pre-Bid
Scheduled, Optional - 4/23/2026 @ 09:00am @ (for location please or )
Estimate
$2,150.000
Owner
City of Arlington
Trades
Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Work shall include traffic control, sewer bypass system, pavement saw-cutting and removal, trench excavation, gravity sewer pipe and manhole upsizing and replacement, side sewer locating, side sewer reconnection, forcemain reconnection, surface restoration including trench patch, testing and all other incidental work for a complete upsizing of the 67th Ave Sewer Interceptor.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.
  • or to view email address.

Plans & Specifications

or to view plans and specification details.

CBS ID: 819633 | Published 4/17/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208