#821385 Posted 4/28/2026

Lift Station No. 1 & WPCF Chlorine Contact Channel Isolation Valve Replacement, Everett, WA

Owner Reference
2025 012187 & UT3851-1-1-2
Bid Date
May 19, 2026 at 02:00pm
Pre-Bid
MANDATORY - 5/6/2026 @ 02:00pm @ (for location please or )
Estimate
$590,000
Owner
City of Everett
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Contractor to construct and/or install the following, including but not limited to: Project A: 1. Temporary erosion and sediment control measures. 2. Trenching, excavation, shoring, dewatering, bedding, backfill, and compaction for installation of a new plug valve, precast vault, and line stop fitting along an existing 30-inch ductile iron force main. 3. Bypass pumping from backup LS 1B to the LS 1 wet well to facilitate installation of the line stop, new 30-inch valve, and associated appurtenances. 4. Installing a line stop fitting, including pouring and curing a concrete block under the existing pipe to support the line stopping equipment, to execute a line stop and removing the line stop equipment and sealing the line stop fitting when the valve installation is complete. 5. Removing a portion of the existing 30-inch ductile iron force main to facilitate installation of the new plug valve. 6. Installing the new 30-inch plug valve, connecting piping, and associated appurtenances. 7. Installing a precast vault for the new 30-inch plug valve with cast-in-place footings. 8. Surface restoration. Project B: 1. Temporary erosion and sediment control measures. 2. Removing and reinstalling the existing chlorine contact channel isolation valve vault cover to facilitate replacement of an existing 48-inch butterfly valve. 3. Cutting the flange off the existing 48-inch concrete cylinder pipe in the vault to facilitate installation of the new valve. 4. Demolishing and removing the existing isolation butterfly valve, stem, and operator pedestal at the chlorine contact channel isolation valve vault. 5. Installing a new 48-inch butterfly valve, flange coupling adapter, and pipe support in the existing chlorine contact channel isolation valve vault.

Bonds required. Prevailing wages.

Contact

  • or to view contact name.
  • or to view phone number.

Plans & Specifications

or to view plans and specification details.

CBS ID: 821385 | Published 4/28/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

Documents

DBE/HUB Outreach Ads

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208