Well Pump and Control Building, Country Park Well, Grandview, WA
- Owner Reference
- DWSRF Proj No DWL27055, ARPA Proj No 1052, HLA Proj No 22149B
- Bid Date
- May 14, 2026 at 10:00am
- Owner
- City of Grandview
- Trades
- *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
- Phase
- New Construction, Addition, Expansion
- Duration
- 120 working day
Description
Project will include installation of a new well pump and construction of a new CMU well control building with dedicated spaces for chlorine injection and pH adjustment, air stripping treatment equipment with blower, booster pump, and associated electrical and HVAC work. Additional work includes construction of a 455-foot transmission main with fittings, connection to the existing water system, and sitework including fencing, gates, and drainage connection to the existing sewer system.
Bonds required. Prevailing wages.
Contact
- or to view contact name.
- or to view phone number.
- or to view email address.
Plans & Specifications
or to view plans and specification details.
CBS ID: 822183 | Published 5/4/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
Documents
DBE/HUB Outreach Ads
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at (888) 988-1208