Browse all Los Angeles County, CA
Citywide Tree Maintenance Services, Baldwin Park, CA
Citywide Pedestrian & Vehicle Traffic Safety Improvements FY 25-26, West Covina, CA
Major work components include installation of pedestrian and vehicle traffic safety improvements including signage, striping, and pavement markers at various locations Citywide and all related work as per plans and specifications. Major work components include the installation of pedestrian and vehicle traffic safety improvements, including but not limited to signage, striping, and pavement markers at various locations citywide, and all related work as per Exhibit A project plans, notes, and specifications.
Street Underpass Pump Replacement Project, West Covina, CA
Major work components include removal of the existing frame-mounted pump, installation of a new dry-pit submersible end suction pump, removal and installation of a new control panel, fabrication and installation of custom suction and discharge piping spools, re-grouting of the pump as needed, installation of new seal and thermal relay controls with rewiring of existing controls, system startup, SCADA integration, and all related work as shown in specifications.
Elevator Maintenance and Repair Services, Pomona, CA
The City of Pomona is requesting bids from qualified vendors for Elevator Maintenance and Repair Services.
NEW BID DATE*PRE-BID RESCHEDULED: Design-Build Services for a Hydrogen Fueling Station, Pasadena, CA
PW 1636 Mills Park Site Improvements and PW 1895 Mills Park Building Renovations and Building Perimeter Site Improvements, Carson, CA
On-Call Construction Management and Inspection Services, Lomita, CA
2026 Annual Street Maintenance Project, Malibu, CA
In general, the proposed improvements consist of mobilization, traffic control and construction signing, stormwater pollution prevention plan and implementation, record of construction changes, full depth pavement repair, trench repairs, surface preparation and crack seal/fill, pavement delineation striping and signing, constructing asphalt berms, cold milling, full depth pavement repairs, utility cover adjustments, speed bumps, placement of 2 asphalt-rubber hot mix overlay on Portshead Rd, Boniface Dr, Grayfox St and Wildlife Rd, and placement of slurry seal overlay on Selfridge Dr, and Wildlife Rd, and all other appurtenant work included and shown in the Contract Documents and Specifications.
Construction Management and Inspection Service, Norwalk, CA
The City of Norwalks Engineering Division of Public Services Department is seeking a qualified consultant to provide Construction Management and Inspection Services for Alondra Boulevard Pavement Rehabilitation from Studebaker Road to Gridley Road.
Progressive Design-Build Services for the Burbank Library and Civic Center, Burbank, CA
Waste Water Treatment Plant Lab Roof Modification and Casino Showers and Restroom Roof Remediation, Avalon, CA
The City is requesting proposals from qualified firms/licensed contractor to provide all labor, materials, service and specialized skills for the Roof Modification and related scope located at 123 Pebbly Road, Avalon, Ca 90704 and 99 Casino Way, Avalon, Ca 90704.
Street Lighting Modernization Program - Package 2 Project, Santa Monica, CA
Notice is hereby given that the City of Santa Monica invites Contractors to complete and submit electronic bids for the: Street Lighting Modernization Program - Package 2, SP2574.
Safe Routes to School, Placerita Junior High School & Hart High School, Santa Clarita, CA
Pond Maintenance, Pasadena, CA
NEW BID DATE*2ND PRE-BID SCHEDULED: Furnish and Deliver Utility and Miscellaneous Street Repairs WD-26-02, Pasadena, CA
Work will be ordered by the Water and Power Engineer issuing paving lists which will specify the locations of paving work, the types of work to be performed, and the nominal dimensions or the limits of the work required.
Puente Hills Materials Recovery Facility Modification of the Stormwater Capture System, Whittier, CA
This project will improve the performance of the existing stormwater capture system to minimize stormwater monitoring and sampling frequency. The project includes replacing and upsizing the existing 15 hp storm water pump to 25 hp submersible pump at Drainage Area 3, installation of approximately 1,270 linear feet of 12-inch PVC pipe, and replacing 170 linear feet of 10-inch PVC pipe.
Alondra Blvd. Pavement Rehabilitation from Studebaker Rd. to Gridley Rd., Norwalk, CA
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. The project involves cold milling existing AC Pavement, AC Removals and Reconstructions, ARHM Overlays, AC Base Overlays and Adjusting Utilities to Grade; signing, striping, and traffic control; removal and replacement of cross gutters and spandrels, including adjacent curb and gutter, sidewalk, ADA curb ramps and other appurtenant work.
Polytechnic High School Improvements Project, Long Beach, CA
Darby Park Improvement Project, Inglewood, CA
Restripe parking lot, new light fixtures, landscaping, irrigation.