CDBG FY 2025-2026 ADA Wheelchair Access Ramp Replacement, Orange, CA
City of Orange is inviting bids for the labor, materials, tools, and equipment necessary to complete the CDBG FY 2025-2026 ADA Wheelchair Access Ramp Replacement.
Need an account?
Remembered your password?
Already have an account?
City of Orange is inviting bids for the labor, materials, tools, and equipment necessary to complete the CDBG FY 2025-2026 ADA Wheelchair Access Ramp Replacement.
City of Orange is inviting bids for the labor, materials, tools, and equipment necessary to complete the CDBG FY 2025-2026 Street Rehabilitation.
In general, the work is comprised of public works construction including play equipment and safety surfacing installation, steel handrail repairs, site furnishing replacement, park monument sign installation and minor restroom building repairs and replacements and other miscellaneous improvements as shown on the plans and as required to complete the work.
In general, the work is comprised of public works construction including playground renovation, ada improvements, drinking fountain replacement and new park sign, and other miscellaneous improvements as shown on the plans and as required to complete the work.
In general, the work is comprised of public works construction including playground renovation, ADA improvements, drinking fountain replacement and new park sign, and other miscellaneous improvements as shown on the plans and as required to complete the work.
In general, the work is comprised of public works construction including play equipment and safety surfacing installation, site furnishing replacement and installation, park monument sign installation, concrete flatwork installation, landscape and irrigation installation and other miscellaneous improvements as shown on the plans and as required to complete the work.
In general, the work is comprised of public works construction including play equipment and safety surfacing installation, site furnishing replacement and installation, park monument sign installation, concrete flatwork installation, landscape and irrigation installation and other miscellaneous improvements as shown on the plans and as required to complete the work.
In general, the work is comprised of public works construction including unclassified excavation, tree and root removal, asphalt removal, asphalt concrete pavement construction, removal and replacement of decorative concrete paving, signing, striping, relocate existing monument and footing, median curb removal, curb construction, and other miscellaneous improvements as shown on the plans and as required to complete the work.
Orange County Sanitation District (OC San) is a public agency responsible for collecting, treating, and safely disposing of wastewater and its residuals. OC Sans collection system includes approximately four thousand (4,483) manholes. The purpose of this Scope of Work (SOW) is to replace the damaged manhole frames and covers identified by OC San with OC San provided frames and covers.
Drew Park: The work of this Contract will consist of removing the existing swings, removing the existing play area, removing the sand from the play area, removing earth, irrigation lines and heads, a tree, and moving a bench (protect) for the new swing area. Contractor will then install a new swing area and swings, and install a new play structure, owner furnished. Once the poured-in-placed rubberized surfacing is installed by product vendor, the Contractor will return to the site to finish installation details and demobilize. Robinwood Park: The work of this Contract will consist of removing the existing swing and play structures, along with the existing surfacing (sand). Contractor will then install two (2) new play structures and swings, owner furnished. Once the poured-in-placed rubberized surfacing is installed by product vendor, the Contractor will return to the site to finish installation details and demobilize.
Replacement of the existing chillers, boilers, piping, and associated pumps, removal of the ice bank system, retrofit of the existing Variable Air Volume boxes, and replacement of the HVAC controls system.
The Contractor shall furnish all labor, materials, equipment, tools, and utility and transportation services and perform and complete all work required in connection with Bid #1498 AV Upgrade at Centennial Education Center Project.