NEW BID DATE: Storm Drain Improvements at East Avenida Cordoba & Via Avila, San Clemente, CA
The work to be performed, in general, consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents for the construction of the Storm Drain Improvements at East Avenida Cordoba and Via Avila, City of San Clemente. The general method of the storm drain construction work includes demolition and replacement of existing concrete catch basins, local depressions, cross gutter, A.C. pavement and Portland cement concrete curb & gutters, sidewalks, curb ramp, traffic detector loops, trenching and installation of new Reinforced Concrete pipes (RCP) within existing roadways and Right-of-Ways, erosion control BMPs, and construction of new concrete junction structures, manholes and collar. The work also includes traffic control.